Skip to main content

IS5113 Week 5 New Lesson 8

 Which  of the following trend models displays a steady increase or decrease in the value of variables over the period of time?

A) Linear


Which of the following features of the tableau enables the user to find groups or individual data points based on various selections made by the user?

A) Clustering 


Which of the following clustering algorithms were used by tableau to group similar data points?


A) K-means

Which of the following features of tableau helps the user to quickly visualize the confidence intervals, percentages, percentiles, quantiles, and standard deviations of the dataset?

A) Distributions 


In Tableau, which of the following statistical measures defines the probability of obtaining the same trend result without taking the dimension into account?

A) P-value


In Tableau, which of the following models helps in predicting and visualizing the future values?


A) Forecasting


In Tableau, which of the following trend model makes an s – shaped curve?

A) Polynomial





















































Comments

Popular posts from this blog

IS5203 Type 2 Post Assessment and Final Quiz

  Carlos has just created a new subnet for the finance department. He needs to be able to allow the employees in finance to retrieve files from the sales server, which is located in another subnet. Which of the following OSI model layers would it be necessary to categorize the device into? a. Layer 4 b. Layer 6 c. Layer 2 d. Layer 3 All of the cubicles in a company's office have cables that run up to the ceiling and across to an IDF. Inside the IDF, they connect directly to the latest generation switch available from the networking equipment vendor that they have chosen. Which of the following describes the physical topology most likely in use? a. mesh

GE5103-2 Project Management [Aug 23 Syllabus]

    Some of the advantages of using time boxes and cycles in project coordination efforts include creating urgency, measuring progress, and allowing for predictable measurements. A)        True 2.    Even though most project managers are not contract specialists, they need to understand the process well enough to coordinate with the team. For the current assignment, you are looking at a short-term and small effort with a contractor of just a few hours without significant clarity. Which of the following would be the most applicable contract to use in this situation? A)        Time and materials 3. The project you are working on has had modifications to the plan from the start and even how the project is run. Project governance covers all of the 3 following except: A)        Naming The project manager 4. Of the following, which is most likely a trigger condition defined early in the project? A) Alerting Governance board if 10 percent over schedule 5. Of the following options, which stand

GE5163 Week8 ( Final Exam ) Quize's

  A process or product that is insensitive to normal variation is referred to as being Select one: a. in specification b. capable c. robust d. out of control Feedback Your answer is correct. A completed failure mode and effects analysis (FMEA) results in the following assessment rating.      Occurrence = 4      Severity = 8      Detection = 10 What is the risk priority number (RPN) for this FMEA? Select one: a. 42 b. 22 c. 320 d. 120 Feedback Your answer is correct. In a visual inspection situation, one of the best ways to minimize deterioration of the quality level is to: Select one: a. have a program of frequent eye exams. b. retrain the inspector frequently. c. add variety to the task. d. have a standard to compare against as an element of the operation. Feedback Your answer is correct. Which of the following elements is least necessary to a good corrective action feedback report? Select one: a. What caused the failure b. Who caused the failure c. What correction has been made d. Wh