  Some of the advantages of using time boxes and cycles in project coordination efforts include creating urgency, measuring progress, and allowing for predictable measurements.

A)      True

2.  Even though most project managers are not contract specialists, they need to understand the process well enough to coordinate with the team. For the current assignment, you are looking at a short-term and small effort with a contractor of just a few hours without significant clarity. Which of the following would be the most applicable contract to use in this situation?

A)      Time and materials

3. The project you are working on has had modifications to the plan from the start and even how the project is run. Project governance covers all of the 3 following except:

A)      Naming The project manager

4. Of the following, which is most likely a trigger condition defined early in the project?

A) Alerting Governance board if 10 percent over schedule

5. Of the following options, which stand out as the most applicable to situations where escalation is necessary? (Choose two.)

A) 1. Some situations where the team is stuck and require assistance from the sponsor

     2. Any time that a requirement is beyond the tolerance level defined

6. Match the following terms with their definitions. 



7. The team has been working together for many months but finally is ready to test the end result. A fairly new employee isn't sure why the team has been told that work will be halted after it goes to testing. Which of the following would not be a reason that might be used by an experienced project manager

A) The team is about to perform a spike and needs the time to avoid making changes.

8. Another way to describe the scope baseline is that it is the current expected work to be performed from this point forward.

A) False

9. Phase gates tend to be a tool used to approve work at various completion points (gates) and then allow the work to proceed to the next stage (phases).

A) True

10. Risk management is a complex area within project management because it entails lot of guesswork about what will or will not occur but includes several areas of how to handle such risk. Of the following, which TWO would be covered under the risk management plan?

A)

1. Tracking documents required for the specific project

2. Specific funding reconciliation limits

11. The construction project that the team has been working on for a couple years is coming to a close. Individuals have been working to keep solid notes on the things that have gone well and gone poorly, and they wish to share these notes with one another. During the session, these notes are recorded and then will be retained by the project manager in which resource?

A) Lessons learned register

12. To lead a team that will certainly face conflicts in work product, schedule, budget, resources, and other areas, you will have to engage in emotional intelligence, leadership, influencing, and decision-making.

A) True

13. Throughout the life of a project, you are focused on assuring the stakeholders get the right information at the right time. Which is not a part of the communications management plan?

A) Records for project duration

14. During the progress of making a new service protocol, the team has become aware of an outside supplier, for current work, which has filed for bankruptcy. Considering the situation is urgent, what would be the best response for the team?

A) Do what is possible to reduce the impact of the risk by shifting a few team members to locate and secure another supplier.

15. Global projects now require resources that did not meet the expectations of project managers years ago. They require more flexibility for remote, virtual, and on-demand collaboration. Of the following, which is least relevant to a globally dispersed, non-co-located team?

A) Caves and commons

16. When calculating the schedule variance of project that is around 60 percent complete, which formula would you use?

A) Earned value minus the planned value

17. A control account is typically used to identify actual cost to the budget and can be used for earned value calculations.

A) True

18. When using a RACI chart, which of the following would a non-sponsor executive most likely be labelled during the period when work s being produced?

A) Inform

19. When you are considering a quality management plan, what are the benefits? (Choose two.)

A)

1. There should be an improved focus on the value delivered from the project.

2. Expectations are that the project will see fewer cost overruns.

20. A scrum team is currently too large, causing inefficiencies with completing tasks, and this is causing the daily standup meeting to take too long. What would be the best approach in this situation?

A) Create two or more smaller teams and organize scrum of scrum meetings.

21. When you are breaking down projects into their subtopics, predictive and agile have varying terminology. Match the terms to the predictive or adaptive/agile toolbox.

A)



22. The primary role of the project manager on an adaptive project is to focus on directing the work in regular increments so that the work doesn't fall behind schedule.

A) False

23. Which of the following are specifically ceremonies that would be used in a Scrum framework for a project with a very flexible scope? (Choose two.)

A)

1. Sprint Planning meeting

2. Daily Standup

24. The use of a product backlog would be an agile artifact.

A) True

25. Iterative scheduling with the team allows for all of the following except:

A) Determination of an exact delivery date based on the number of points completed and remaining

26. A senior project manager will be leaving the organization in a few months. You have been asked to draw from as much of their experience as possible. You have determined to meet with them every week. Which will be the most effective way to achieve knowledge transfer during this exchange?

A) Schedule a formal meeting almost every week to have a face-to-face conversation.

27. The cost baseline is useful for every project manager and includes all of the following but which category of costs?

A) ‘Management reserves

28. Your current project team has been working for some time on the involvement from all relevant stakeholders. Of the following, which is the most problematic level of engagement?

A) The individual who has been provided several communications about the long-term effects, but when you ask their opinion, seems surprised that there was a coming change

29. Although an agile team is usually not held to specific deadlines for the overall project, team members frequently use tools to track progress within a specific iteration. Which of the following are most likely the visual tools used for monitoring such project? (Choose two.)

A)

1. Kanban board

2. Burnup chart

30. The team you participate on is a lot of fun. Group members make decisions together based on input from everyone. There is a minor detail that seems to have sparked a variety of concepts. Any of the ideas might work, but a single decision must be made. Which of the following would be least necessary for making a team decision?

A) Unanimity

31. The current project manager for your team suggests that the team give specific details for the work to be completed in the short term but then provides only high-level plans for the long term. You are surprised to hear this but then remember that this is called ____.

A) Rolling wave planning

32. Every meeting is a chance to transfer information. It may come from individuals or be provided to the participants of the meeting. Which of the following is least likely to be beneficial for the team meeting?

A) Allows maximum efficiency when there is a free-flowing approach

33. Your team has been working on a construction project with a well-defined structure, cost, and schedule. Several mistakes and some great discoveries were made during the process. You are looking for a way to capture this information. What is the best way?

A) Gather the team and enter the lessons leamed into a register.

34. A project team member has been with the organization for only a short time. You explain that the change control system is specifically designed to avoid unnecessary changes to the project, which may include all of the following but which one?

A) Specific pre-established maximum number of changes to the project

35. Match the most likely communication frequency to the communication type.

A) 



36. of the following options, which is the least beneficial life cycle for a flexible scope?

A) Predictive

37. One of the tools used in more lean projects is that of a value stream map. Of the following terms, which is probably excluded from a value stream map?

A) Estimates of product contracts involved

38. The official leader of this team behaves differently than those you have known before. This leader is focused on helping team members succeed at the work they attempt. This focus forms a bond with the team and leader. Of the following, which characterizes the servant leader least effectively?

A) Addressing the team from a task-focused perspective

39. Which of the following is least likely to use cost estimates throughout the project life cycle?

A) Terms and conditions

Z

40. Over the past few days, the project sponsor has been working on the project charter with the project manager they have assigned. A team has not been developed yet. As they work through the project charter, they remind each other of the primary reason for this document, which is

A) To generate the vision of the expected outcome and align with organizational strategic goals.

41. All of the following would be considered project variances except:

A) A risk that the project may be out of resources necessary near the end is identified.

42. Based on your experience with Agile you have been brought on to a scrum project as an Agile coach. On your first day you realize that the different scrum teams are working independently, and the scrum masters do not know the work of the other scrum teams. They also are not aware of the status of the other teams. What is the most likely reason for this?

A) A scrum of scrums was not set up

43. {In the sender-receiver model of communication, the person who receives the message is said to________ the message.

A) Decode

44. project team has noted that they are having a difficult time acquiring as many staff members as they need This is especially true in the technical fields. shortage of staff and contractors would fall under.

A) Enterprise environmental factors

45. Throughout the project life cycle, your project manager has repeatedly emphasized how important it is for the team to observe and record important learnings that will affect future projects. Which of the following is least likely to be a fair statement to or of the team?

A) Note all details of the specific product features that this client requested.

46. It would come as no surprise that most projects involve a large series of contracts to confirm expectations of the work and who will be delivering the work. You are not sure that there is enough time to get a contract in place up front but wish to start work. Which tools might more likely be used while a contract is being developed? (Choose two.)

A)

1. Memorandum of understanding

2. Letter of intent

47. Of the following, which is the correct range for a net promoter score?

A) -100 to 100

48. Following is a list of consensus methods. Match the method with the closest description.

A)



49. When you are confirming that the product, service, or result is complete to a work breakdown structure, many terms and satisfying conditions might be met. Which of the following is the only predictive term used for this purpose?

A) Acceptance criteria

50. Which of the following options are considered interpersonal and team skills? (Choose two.)

A)

1. Transparency

2. Motivation

51. At the beginning of the project, the team has assembled a list of all requirements and measurements that will be used to address the overall project work. Of the following, which is the proper response that the team should take to confirm the work product?

A) Check with the product owner and make sure that they verify requirements.

52. You are an experienced team facilitator recently hired by your company to lead its first Agile project. Your team is asking which artifacts it will need to update as the project progresses. Which of the following is not an artifact used in Agie?

A) Schedule baseline

53. When you are closing a project, when does the closing process begin?

A) When the planned work is completed

54. When should the team and product owner perform backlog grooming?

A) Regularly throughout the project

55. Quality is best defined by the degree to which a product, service, or result meets the defined requirements.

A) True

56. Scope management requires a number of skills and tools for a practiced user. Of the following, which tools or techniques would be useful for the project team to employ for scope management? (Choose two.)

A)

1. Demonstrating expert judgment with decisions

2. Seeking alternatives to the project approach and execution

57. often, project teams are expected to provide an interpretation of results and status over time. Of the following, when you're working with a predictive project, which is not a formal step or component of the project?

A) Work performance expectations

58. You, as a project manager, sent about half of your team to a specialized training to develop a specific skill so that it doesn't slow down the team in the long run. Which is the best way to assure that training occurred?

A) Use baseline and post-training assessments.

59. When looking to motivate a team, you want to enable their ________ to sacrifice for the company goal and also to keep your own ________ at peak levels, regardless of obstacles.

A)

1. Commitment

2. Optimism

60. Feedback is a regular process during communication. If it is in person, the feedback is immediate. Which of the following statements is least true about feedback?

A) The typical feedback should come in formal survey format to avoid confusion.

61. Of the following, which is the least important aspect to use while working with stakeholder identification?

A) Stakeholder communication and RACI diagrams

62. When developing the work breakdown structure (WBS), a collection of team members put in a lot of thought and effort. Of the following, which words best describe the effort of work decomposition and the ultimate WBS created? (Choose two.)

A)

1 Hierarchical

2. Logical

63. You are part of an Agile team. It is late in the day and you still have not received the data from another department that you need to get started on the next user story. What would be the best approach in this situation?

A) Bring this up at the daily stand-up meeting the following morning

64. Which of the following items are least likely to be used when there is a contract dispute? (Choose two.)

A)

1. Nonconformance to an internal process is not covered by the contract specifically.

2. The project manager negotiates the settlement between supplier and the buying company.

65. The minimum viable product is the smallest segment of work that may be produced at a given time and still provides some value.

A) False

66. You are determined to acquire a high-quality team of individuals who will support the effort from the external client. You will not have a lot of time, so you wish for them to be self-sufficient. Of the following, which is least beneficial to this team?

A) Subject matter experts involved with advanced certifications

67. The managers of a few teams are debating which is better to provide incentives for future efforts on their projects. They are looking at various ways to reward or recognize individual efforts. Of the following, which is not a trait of recognizing employees?

A) Providing for something economic such as money or a gift

68. Match the following terms to their definitions.

A)



69. As the lead in a project team, you are trying to assure that all of the interests of parties are included into the overall planning and therefore would most likely I use which of the following tools?

A) Stakeholder register

70. Knowledge transfer occurs between team members both intentionally and unintentionally. The organization will benefit least from which of these options?

A) Templates for all portions of the process to expedite the work

71. The use of shared task boards, videoconferencing, lessons learned repositories, and chat functions all increase collaboration.

A) True

72. Resource assignments should occur based on team members assigned to the project, roles and responsibilities, a team directory, organization charts, and I schedule.

A) True

73 The project sponsor has asked for time with the project manager to go over plans for the next project. Of the following, which is the least relevant to the business case?

A) Provides the initial funding for the project

74. The current project has a cost performance index of 0.8. The estimate at completion would most likely be calculated as:

A) Higher than the original estimate

75. You have a new employee who has no experience with projects. This person has never dealt with quality either. When discussing levels of quality, you would note that the most restrictive include

A) De jure regulations

76. There are many potential places for risk to pop up. The team needs to be mindful throughout the entire project that new risks may arise. Which of the following sources would not be a formal source-based risk classification?

A) Scope-based risk classification

77. Training artifacts include components such as courseware, lab configurations, pre-tests and post-tests, and trainer updates.

A) True

78. The topic of organizational theory is focused on how people, teams, and organizations behave.

A) True

79. In the past week, you have noticed that the project team changed two tasks from A to B on the project schedule to B to A. This change seemed odd because you thought the schedule was locked in, but apparently not, because the same team resources are doing the work. This dependency would be represented by which terms? (Choose two.)

A)

1. Discretionary

2. Internal

80. The team to which you have been assigned was asked to consider the potential negative consequences of implementing the new service. Of the following, which risk identification techniques would you not consider using?

A) Retrospective of iteration

81. There are quite a few ways to rank the requirements and expectations for a project’s outcome. Which of the following would be used for this purpose to ensure all stakeholders' interests are included? (Choose two.)

A)

1. MoSCoW analysis

2. Kano model

82. The appropriate governance for your project will likely be unique for each project; therefore, the project team members will be key in establishing such.

A) False

83. Match the following terms to their definitions.

A)



84. Match the following terms with their definitions:

A)



85. When working with the software development team, the organization has determined that the best way to improve productivity is through _____ and 3

A)

1. Teamwork

2. Autonomy

86. When working with your project team, you note the project leader is focused on getting things done more quickly. It's a common theme on all projects you have observed or participated on. Of the following, which would be least relevant to encouraging this culture?

A) Emphasize the initial project plan and avoid deviations from such plans.

87. The critical path is a singular path or sequence of activities through a project that defines the minimum time the project may take.

A) False

88. There are numerous ways to communicate, and they can be categorized in a myriad of ways. However, in project management, two broad categories require the sender to provide information known as ___________ or the receiver to locate information known as ____________

A)

1. Push

2. Pull

89. You have been monitoring the status of a project and wish to confirm it is well within the metrics established by the team up front. Which of the following options would be considered quality management data visualizations? (Choose two.)

A)

1. Cause-and-effect diagram

2. Scatter diagram

90. Risk is the negative effect of a situation to the project outcomes.

A) False

91. when you are evaluating business value provided to the end user or customer, which of the following may be excluded as least relevant?

A) Your team has collected significant information to allow your organization to become more efficient.

92.  The team has been assigned to a complex detail and is looking to determine the exact delivery date for the detail. Team members should use planning poker to obtain story points to estimate in this situation.

A) False

93. The types of contracts that would be most likely agile are not the same s traditional projects. Of the contract types noted here, which are least likely to be used for an agile project? (Choose two.)

A)

1. Fixed fee plus incentive

2. Firm fixed price

94. Which of the following terms are for the specific ceremony where members meet for 15 minutes each day to discuss action and issues? (Choose two.)

A)

1. Daily Scrum

2.  Daily standup

95. When completing lessons leamed, most teams attempt to be as complete as possible. Which of the following is least important to the project manager for future improvement?

A) Product-specific lessons learned

96. A colleague advised you that, as a new project manager, you will be expected to provide leadership support to your team. Which of the following would be the most appropriate items to select for this role? (Choose two.)

A)

1. Encourage the team to support project value delivery.

2. Remove roadblocks, obstacles, and impediments.


97. The stakeholder register is first prepared in which of the five process groups?

A) During initiation phases with the project sponsor

98. The WBS dictionary is important to explain many of the work packages that the team has outlined. Which of the following items would certainly be included in a WBS dictionary? (Choose two.)

A)

1. Cost estimations

2. scheduled milestones

99. You are managing a large Agile project and have advised senior management that because Agile teams are generally small, the best approach will be to have several small Agile teams for this project. Senior management is concerned by this and is questioning how teams will know what other teams are doing. You should explain to senior management that you will ___________to alleviate their concerns.

A). Create regular scrum of scrum meetings

100. For the last week, the team has been assessing what it would take to design the product inside the group but also has received bids from a few contractors. This method is best known as the

A) Make-or buy analysis

101. Which of the following are advantages of focusing on the minimum business increment? (Choose two.)

A)

1.  Enabling the project team to deliver more quickly

2. Permitting the improvements to be validated more efficiently

102. There are many ways to determine the risk of a specific project. Quantitative risk analysis takes significantly longer than qualitative risk analysis.

A) True

103. You, as the project manager, have worked with the team to provide the project scope statement based on the project charter and business documents. Which of the following is least likely to be found in the project scope statement?

A) Contract types used for subject matter experts in the closing phase

104. When dealing with project resource calendars, which of the following is least relevant to the project team?

A) Currency used

105. During the latest iteration of a project, the team faced a situation that required the leader to step in and assist. Ten machines were working on a product, but four of them became nonfunctional. To keep work moving at the same pace, the leader rented four temporary machines to assist. This would best be represented by:

A) Impediments

106. The ground rules established by the team benefit the group by ______and ______:

A)

1. Decreasing risk of confusion

2. Setting performance standards

107. Match the risk response to the example. If it were raining outside, and you were staying at a hotel, how you would address the risk?

A)



108. Match the following terms to their definitions.

A)



109. Which of the following columns would be least useful to the project team on a stakeholder register?

A) The work packages for which the stakeholder would take responsibility

110. The team that you participate in has experienced a lot of progress, and you just heard that you are coming up on a major milestone. Which of the following statements is not true about milestones?

A) Milestones may be one of the most expensive parts of the project.

111. Of the following examples, which will most likely benefit from an agile or adaptive set of project management tools.

A) Development of a 100-level video game

112. The organization for which you work has been developing a new service for clients. This has been going on for about a year. Its a new industry, and you are not certain how much you have accomplished compared to competitors. To make this comparison, you would best be suited to perform

A) Benchmarking

113. Your role as a project leader is to focus on the team’s development through facilitation and servant leadership.

A). True

114. As a project manager, you spend much of your time focusing on the communication aspect of the project. Of the following, which is /east relevant to a successful team from a communication perspective?

A). Determining the best time of day to meet with the client

115. Over the past two weeks, several frustrating conditions have caused the team’s productivity to slow down. Impediments would be measured by using the —and the  ____.

A)

1.  kanban board

2. Issue log

116. As a senior project individual with more experience than many people on your team, you note that the hybrid function that the team performs uses many different tools. You explain that because the schedule is important to the client, they want exact dates, so your team has elected predictive tools for this aspect. Which of the following schedule models would be appropriate? (Choose two.)

A)

1. Gantt chart

2. Milestone chart

117. You have been dealing with a client who requests changes frequently, despite there being a detailed initial plan in place with schedule and budget. Each time the client requests a modification, you refer to the change management plan, which addresses all of the following but which?

A) What is the maximum budget that can be extended to with client and sponsor approval?

118.  Communication has been said to be 90 percent of a project manager's job. When you are communicating with a sensitive topic to a variety of stakeholders, which method would be best for interpreting subtle feedback?

A) Face-to-face meetings

119. A scatter diagram is most frequently used to demonstrate the relationship between two or more variables and to see the relative relationship in the data.

A). True

120 Match the social skills with the managerial skills in the right column.

A) 



121. Match the correct project management method (lifecycle) to the project agreement objective.

A) 



122. Of the following, which is the least concerning or least likely for the project team when dealing with causes of change?

A) The project team has different functions; therefore, some of these minor conflicts require adapting the work.

123. Many parties are involved in delivering most projects. When you are dealing with a client and project that expect to have many changing requirements throughout the life cycle, which of the following parties will have the most contact with the delivery of features, stories, and tasks? (Choose two.)

A)

1. Project team member

2. Scrum master

124. When the team is working with a client who prefers to avoid risk, they need to measure the so that they know how little risk they wish to take and the to know the maximum time or funding deviations they can afford.

A).

1. Risk threshold

2. Risk appetite

125. Align the terms under the categories of configuration control and change management plan.

A). 



126. Many subsidiary plans of a project could include combinations of skill. When you are dealing with vendors or suppliers over a lengthy timeframe, all of the following are steps that might touch both procurement and communications planning at the same time except which of the following?

A) Supplier selection criteria revised during execution

127. The team is working on developing a new cellular telephone. Which of the following options would most likely fall under project scope definition? (Choose two.)

A).

1. Specific deliverable work components such as defining the case, glass, and electronics

2. Identifying exclusions that will not be provided by the project team such as marketing and sales

128. Your team works in a hybrid environment and recognizes that sometimes the original plans, short term or long term, are off pace with expectation. Of the following, which s least likely a measure of the variance analysis?

A) Use of the team charter for task completion

129. here are many primary reasons and some secondary reasons for having contingency responses prepared in advance of a risk event. Of the following, which is least likely to be a benefit noted?

A) It will keep the planning time down for initial efforts and thus reduce budget needs.

130. The team that you manage is outlining a proposed process which will expedite the overall delivery of product for your client's customers. Which of the following would be the /east beneficial approach to solving this scenario?

A) Provide a physical prototype of the product being shipped.

131. During the life cycle of the project, an individual must use a number of skills and sometimes improve those skills to meet the tasks at hand. When someone with a skill that requires experience attempts to pass it along to others, this would best be represented by

A) A mentor looking to pass along tacit knowledge to the team member

132. While you are working on a long-term construction project, certain paths and activities are not crucial to start at the earliest date but can be delayed for a variety of resource reasons without delaying the overall project. These tasks usually are referred to as having float or slack.

A) True

133. The team is demonstrating the minimum business increment to key stakeholders. More than likely, which ceremony is being performed?

A) Sprint review

134. During a sprint review, the project team reviews all of the progress with the project leader or Scrum master to make sure things are on track.

A) False

135. Itis Monday morning, and you were invited to a 9:00 a.m. kickoff meeting for the newest project in the department. Twenty-five people from various departments are expected, including the client. Which of the following items should not be a part of the kickoff meeting? (Choose two.)

A)

1. Completing the list of required external contractors required for completing the project

2. Establishing an outline for the work to be completed by which dates, with assignments

136. After delivering the final sprint, and the last iteration completed all desired user stories, the project team is ready to move on. One of the final steps is to provide final artifacts that include all but

A) The iteration backiog

137. During a recent meeting, the director of the PMO indicated that use of product roadmaps will be encouraged more in the future. Which of the following is an incorrect statement about product roadmaps?

A) Product roadmaps have a standardized appearance and style across industries and markets.

138. The Kanban board usually has three columns—"To do, work in progress, done"—but may also have several other columns.

A) True

139. Communication is more than just delivery. Which of the following is nota component to active listening merits?

A) Preparing to respond as soon as the individual finishes speaking

140. Of the following, which TWO methods would be used to outline an agile project in terms of the most to least important features or stories?

A)

1. Use the 100 points method with a team

2. Review the product backlog with the owner

141.After working with the team for several months, an intern was unclear on the practical use of a scope management plan. The best explanation would be

A) To describe how the scope will be defined, developed, monitored, controlled, and validated.

142. Allof the following guidelines would be established for focusing on compliance in a project except.

A) Market-specific standards of marketing

143. As the project manager, you will be responsible for several components of the schedule, well in advance of the execution of real work. Which of the following is least relative to the schedule management plan?

A) Contract payment terms

144. Stakeholders not only need to be identified but also need to be classified. Of the following list, which pairing is /least relevant to classifying stakeholders?

A) Newer/established

145. Consider the following measurements and match to their calculation.

A) 



146. When a member of an organization decides to delay deciding on an urgent issue because they are not in agreement with the group’s decision, this would bean example of withdrawal or avoidance.

A) True

147. Due to a recent acquisition of another organization, your company has decided to merge two teams. However, due to the distance, it was determined that most work will be done using an online video platform, electronic data interchange, and email to move things forward. The project manager for this team will have to focus on which of the following more than a co-located group? (Choose two.)

A)

1. Building trust through online social interaction up front

2. Addressing communication methods determined for the project to be successful

148. The retrospective ceremony is most likely developed as a tool to show the customer, client, or owner what the current progress looks like.

A) False

149. Which of the following TWO definitions refer to paperwork and tools used in the project to provide end value to the client, customer, or user?

A)

1. Artifacts

2. Project documents

150. When you are dealing with a specific conflict in an organization, of the following, which would be considered the best resolution approach?

A) Collaboration/Problem solving

151. After a lesson learned exercise, there are a number of ways to make sure of the results. Of the following, which would be omitted from an explanation to a new project manager about these purposes?

A) They should be kept in the project file and privacy guidelines respected.

152. Match the following topics of either agile ceremonies or artifacts to the proper column.

A)



 

 

 

 

 

 

 

 

 

153. When looking to improve social skills, you would pay attention to building your bonds with your network.

A) True.

. 

154. All of the following terms may be used for projects with a well-defined scope, and budget from the outset of execution:

A) Incremental Project Management


 

 

 

 

 

 

 

 

 

 

 

155. Match the term to the Management column or of the leadership column

A)

 


 


156. Collaboration with all stakeholders should be a primary focus of the project manager and team. Which of the following is less likely to be a tenet of the approach with the stakeholder?

A) keeping the agreement alive by engaging stakeholders who support the cause and removing those who do not

 

 

 

 

157. The organization has established some fairly standardized criteria for selecting vendors or suppliers. Of the following, which is least likely to be a source selection criterion?

A. Credit history from 10 years ago

158. Project managers must determine appropriate rates for their team, including availability, experience, knowledge, skills, attitude, and regional representation.

A. true

159. In a more predictive environment, the project manager is more likely to outline expectations and direct the team members and contractors’ performance.

A. True

160. The director of the project management office has been tasked with developing project managers, besides meeting delivery of multiple projects. Of the following, which is the least likely characteristic to be seen in a strong leader?

A. The person most likely to hold the process outlined in the past to assure continuity.

161. Match the following terms to their definitions.

 

 


162. The approach of management by objectives is a tool participants use to measure each outcome by set checkpoints with the customer or owner of a product.

A. False

163. One of your team members has a sudden emergency and needs to take a few days off work during the sprint. However, it turns out that there is an automation process that only this team member knows about, which causes a slowdown on your team’s performance. When would you address this issue to prevent it from occurring again?

A. You would address this at the sprint retrospective

 

 

 

 

164. Through out the life cycle of the current project, your team has stopped to take account of performance – not just the project metrics, but the team itself. Which of the following would be primary benefits of this exercise to the team? (Choose two)

A. 1. Improving team member interaction and communication

     2. Improving team member competencies and skills in the long run

165. Earned value is measured by the amount of cost incurred throughout the life of the project.

A. False

 

166. Projects can be extremely stressful. This means that not only do we need to think, but we need to recognise emotional conditions for ourselves and for others. Of the following, which is most useful to begin with emotional situations?

A. Take a few moments to recognise your own emotional state before moving on.

 

 

 

 

 

 

 

167. You are the project manager on a new project that was just kicked off. The team is evaluating the work to be completed. One individual ask what you mean when you state. “Let’s begin with a document analysis.” Which of the following is least likely to be included in the document analysis?

A. Current project risk register

168. Configuration management may be used for controlling product iterations, product specifications, project documents, standards and testing,

A. True

169. Continuous improvement tools include the lessons learned, retrospectives, and experimentation (or trying new things).

A. True

 

 

 

 

 

 

 

 

170. The team is working on determining the order and linkage between tasks on the project. There is a field survey going on that reaches out to 2,500 customers. One team member started the project report for this work while the survey was still being done but said it will be about one week after the survey is complete for the report to be complete. This is an example of

A. Finish-to-finish relationship

171. You were assigned as the project manager for the ISHU project and well into the execution of the work have found that a specific issue has risen. How would you first address the issue?

A. Document the issue into the log following the template format established during planning.

172. The organization for which you have started working is very large. It has been working with teams of individuals to determine the best ways of working. Of the following options, which one is the least likely to be a part of the disciplined agile approaches?

A. Confirming the initial plan and making sure to execute on it according to the outline.

173. A preparation for your next assignment, a senior mentor has reached out to ask how will you engage individuals on the team and external to the team. This mentor would recommend using all of the following tools to help in this endeavour except.

A. Earned value management

 

174. Conditions that affect a project but are not within their control due to industry, market or organizational requirements would be called Organizational Process Assets (or OPAs).

A. False

175. Which of the following is the least likely collaboration tool to use in an Agile environment?

A. Status reports

176. Match the quality theory to the author.

A.



177. When starting a project, the team with which you are working is focussed on the methods that will be used throughout the project. Of the following, which items would be used to define this method? (Choose two).

A. 1. Team norms

2. Ways of working

 

178. When you are establishing a project team, there will be a variety of scenarios regarding how the staff will be acquired, onboarded, managed, and released. Match the method to the practice.




179. Your project team has made significant progress but recognizes that there remains potential to miss all company and federal requirements. All of the following would be significant benefits to the project team focusing on compliance and risks except.

A. Eliminating the resource shortages that might be faced at any stage of the project.

 

 

 

 

 

 

180.  Projects are rarely completed exactly on the date and exactly on budget with complete satisfaction of the customer/client. Ther is usually a range of acceptable scope, schedule, and budget known as “tolerances.”

A. true

 

 1.  During your assembly line software implementation project, you find that training is not progressing as quickly as the schedule requires and the users are not able to do their work after completing the sessions. After investigating the situation, you discover the trainers do not have the proper experience and knowledge to effectively train your users. Which statement best describes the impact this situation has on the project and the effect your needed actions to rectify the situation will have?

A) The quality and schedule are being negatively impacted. To fix the situation, you likely have to hire more experienced trainers at a higher rate and schedule extra training sessions. Quality and schedule return to planned values while cost increases.


2.  What is the relationship between a project and a product?

A)  A project creates a product.



3.  What are the three main types of organizational structures?

A)  Functional, matrix and project-oriented

A screenshot of a computer  Description automatically generated


4.  What are the process groups of project management?

A) Initiating, planning, executing, monitoring and controlling, and closing

A screenshot of a computer  Description automatically generated



5.  Which of the following would not be considered an enterprise environmental factor (EEF)?

A) Your company’s policies

A screenshot of a computer  Description automatically generated


6.  What are the key skills a project manager needs to be successful?

A) Leadership, technical project management, business acumen



7.  Regarding the importance of management and leadership in projects, all the following statements are false except which one?

A) Managing is primarily concerned with consistently producing key results expected by stakeholders.


8.  You are a project manager working for a regional hospital company. You have been assigned the responsibility to manage a project that performs monthly security vulnerability assessments and addresses any identified vulnerabilities. You question the assignment because

A) The recurring nature of the assessment in addition to the lack of a target end date means that this endeavor is not a project at all.

A screenshot of a computer  Description automatically generated



9.  What are the two most important attributes that describe a project according to the Project Management Institute (PMI)?

A) Produces a unique product, service, or result and is a temporary endeavor

A screenshot of a computer  Description automatically generated


10.  What is the relationship between a project, a program, and a portfolio?

A) A portfolio can consist of programs and projects; a program is a group of related projects.

A screenshot of a computer  Description automatically generated



11.  At what point in a project’s life cycle is the level of uncertainty and risk the highest?

A) At the beginning

A screenshot of a computer  Description automatically generated


12.  Which of the following would be considered project constraints?

A) Quality, resources, schedule, and budget

A screenshot of a computer  Description automatically generated



13.  Project managers need solid communication, leadership, and negotiation skills primarily because

A) They may be leading a team with no direct control over the individual team members.

A screenshot of a computer  Description automatically generated


14.  Who are considered some of the stakeholders on a project?

A) Project manager, customers, end users, operations

A screenshot of a computer  Description automatically generated



15.  Which of the following are some of the eight performance domains of project management?

A) Team, measurement, uncertainty


16.  Which of the following are common functions associated with projects?

A) Perform work and contribute insights, provide business direction and insight, maintain governance

A screenshot of a computer  Description automatically generated



17.  Which of the following are some of the Twelve Project Management Principles per PMI?

A) Effectively engage with stakeholders; focus on value; enable change to achieve the envisioned future state


18.  Your functional manager has told you that she will be responsible for making all key decisions on the project, but you will have the authority to delegate tasks to team members. What is your role?

A) Project coordinator

A screenshot of a computer  Description automatically generated



19.  Which of the following statements best describes the influence of stakeholders over the life of a predictive project?

A) Stakeholder influence is the highest at the beginning and tends to decrease throughout the project.


20.  During your HR software implementation project, two project team members are have difficulty working together. They come to you, the project manager, for help with resolving the issues. You immediately set up a meeting that includes the functional manager. After the meeting, you and the functional manager discuss the issues and agree on a solution. This type of management probably indicates you are working in what type of organizational structure?

A) Balanced matrix



21.  A project manager for a life insurance company is trying to complete a package application implementation project but is unable to get the planned amount of time from key resources to complete some of the critical path tasks. The key resources are focused on completing their day- to-day tasks, and the project manager does not control the work assignments for these people. This scenario is an example of what type of organization?

A) Functional

A screenshot of a computer  Description automatically generated


22.  Which of the following are some of the 10 knowledge areas of project management?

A) Integration management, cost management, stakeholder management

A screenshot of a computer  Description automatically generated



23.  How does a project manager role differ from a Scrum master and product owner on hybrid agile projects?

A) The project manager is focused on the overall project performance. The Scrt process. The product owner is focused on the product being delivered.

24.  Which of the following would be considered an OPA?

A). Standard operating procedures for your organization




25.  What are three different types of PMOs?

A) Supportive, controlling, direclive


26.  What is a System for Value Delivery?

A) A collection of strategic business activities aimed at building, sustaining, and/or advancing an organization

A screenshot of a computer  Description automatically generated



27.  What are some common project constraints that a project manager must balance?

A) Resources, scope, schedule

A screenshot of a computer  Description automatically generated


28.  Which of the following statements best describes the relationship between project life cycle phases and project management processes?

A) Project management processes can repeat within a project life cycle.

A screenshot of a computer  Description automatically generated



29.  What are some of the resources often included in the organizational process assets?

A) Methodologies, templates, document libraries, policies, and procedures

A screenshot of a computer  Description automatically generated


30.  What is project management per PMI?

A) The application of knowledge, skills, tools, and techniques to project activities to meet project requirements

A screenshot of a computer  Description automatically generated


 


1.  Which list best describes an agile development approach?

A) Collaboration, expects change, deliver working product frequently, self-organizing teams

A screenshot of a computer  Description automatically generated


2.  Which of the following statements is not true regarding the relationship between project deliverables, delivery cadence, development approach, and project life cycle?

A) A project life cycle cannot include multiple development approaches and delivery cadences.

A screenshot of a computer  Description automatically generated


3.  Which of the following options best describe how determining the development approach and the project life cycle impacts project planning? (Choose two.)


A)

1. The development approach selection and the project life cycle determination are key aspects of project planning.

2. The development approach(es) selected will determine when and how frequently additional detail planning will occur.

A screenshot of a computer  Description automatically generated


4.  What is meant by delivery cadence?

A) The timing and frequency of project deliverables.

A screenshot of a computer  Description automatically generated


5.  Why are the development approach and project life cycle important to a project?


A) The development approach and subsequent project life cycle must support the effective delivery of business and stakeholder value from the beginning to the end of the project.

A screenshot of a computer  Description automatically generated


6.  Which delivery cadence option indicates there will be multiple deliveries of the product on a fixed schedule?


A) Periodic

A screenshot of a computer  Description automatically generated


7.  A project is charged with deploying a new customer relationship management software package, a supporting mobile application, updating a legacy application, revising business processes, and supporting training modules for an organization that is new to adaptive approaches. Based on the nature and type of deliverables listed, what development approach(es) will likely be used for this project?

A) Hybrid for all deliverables

A screenshot of a computer  Description automatically generated


8.  Which of the following statements is not true regarding incremental and iterative development approaches?

A) Iterative approaches involve developing and deploying the final solution in pieces.

A screenshot of a computer  Description automatically generated


9.  which of the following descriptions would be considered examples of a hybrid development approach? (Choose two.)


A)

1.  Requirements, Design 1, Develop 1, Test 1, Deploy 1, Design 2, Develop 2, Test 2, Deploy 2

2. Requirements, Sprint 1, Sprint 2, Sprint N, User Acceptance Testing, Deploy


A screenshot of a computer  Description automatically generated


10.  Which option contains valid deliverable variables that should be considered when selecting a development approach?

A) Requirements certainty, ease of change, safety and regulatory requirements

A screenshot of a computer  Description automatically generated


11.  Which option best describes the typical relationship between project deliverables, delivery cadence, development approach, and project life cycle?


A) Deliverable type => development approach => delivery cadence => project life cycle

A screenshot of a computer  Description automatically generated


12.  What is the best definition of a project life cycle?

A) The series of phases that a project passes through from start to completion

A screenshot of a computer  Description automatically generated



13.  All of the following are common characteristics of Scrum agile development approaches except which one?

A) Each sprint results in a working product that can be delivered to production.


A screenshot of a computer  Description automatically generated

 

14.  Which option best describes traits of adaptive/agile development approaches?

A) Iterative and incremental development approaches, constant feedback loops, changes are expected

A screenshot of a computer  Description automatically generated


15.  What is the difference between project life cycles and development life cycles?

A) The project life cycle is influenced by the development approach life cycle but includes all the work of the project.


A screenshot of a computer  Description automatically generated

 

16.  Which option best describes the factors that need to be considered when determining the development approach for a project?


A) All pertinent deliverable, project, and organizational variables

A screenshot of a computer  Description automatically generated


17.  Which development approach should be used if the project is determined to be a high- risk project?

A) It depends on the nature of the risks involved.


A screenshot of a computer  Description automatically generated

 

18.  What is the difference between an incremental and iterative development approach?

A) Iterative development is used when progressive elaboration is needed to clarify and refine an initial idea, concept, or vision. Incremental development is focused on delivering components of the deliverable over a period time.

A screenshot of a computer  Description automatically generated


19.  Which of the following options describe a project life cycle? (Choose two.) A)

1. Define, iteration 1, iteration 2, iteration 3, iteration N, deployment, close

2.  Planning-, requirements, development, testing, deployment, close


A screenshot of a computer  Description automatically generated

 

20. Which of the following would not be considered when determining the development approach to be used?

A) Organizational performance management process




1. Your project has a tight deadline, and planning needs to start immediately; otherwise, there may be risks of delays. The sponsor has not signed the project charter and will not be available for another two weeks. What should you do?

A). Explain the urgency of the situation to the sponsor but do not start work until you have a signed project charter.

A screenshot of a computer

Description automatically generated

2. The agile team and product owner are in a meeting discussing a feature, but there is much confusion between team members about the coding. After some discussion, it transpires that one developer was looking at a piece of code from the day before and another from an hour ago. What did the team probably fail to do?

A). Implement an adequate configuration management system.

A screenshot of a computer

Description automatically generated

3. You are an experienced team facilitator recently hired by your company to lead its first agile project. Your team members are asking which artifacts they will need to update as the project progresses. Which of the following is not an artifact used in Agile?

A). Schedule baseline

A screenshot of a computer

Description automatically generated

4. Your team lead has approached you with an issue that you think might be a quick and easy fix. However, this was not in the original scope of the project. What should you, as project manager, do next?

A). Perform an impact analysis.

A screenshot of a computer

Description automatically generated

5. Who is responsible for integrating the activities of a project?

A). The project manager

6. The project manager has completed the project management plan and sent it to the sponsor, other key stakeholders, and team leads for their approval. Upon review, one of the team leads notices an important activity is missing and requests that it be added to the project management plan. What should the project manager do?

A). Add the missing activity to the project management plan.

A screenshot of a computer

Description automatically generated

7. Which of the following is work performance information?

A). “We are 10 percent over budget.”

A screenshot of a computer

Description automatically generated

8. Of the following, which represent the purpose of creating the project charter? (Choose two.)

A)

1. Officially authorizes the project to begin

2. Ensures stakeholders have a clear and common understanding of the project



9. Who should the project manager interact with when performing integration processes?

A). Any stakeholder

A screenshot of a computer

Description automatically generated

10. Which of the following are examples of business value? (Choose three.)

A).

1. 25 percent increase in sales

2. 3 percent increase in market share.

3.  Our product will be nationwide



11. You are requesting a status from your team. One team member states that they are 60 percent complete and the activity has cost $48,000 so far. How would you classify these results?

A). Work performance data

A screenshot of a computer

Description automatically generated

12. You are managing a small construction project, and one of the team leads informs you that there is a problem with the plumbing, but it will be a quick and easy fix. What should you do next?

A). Perform an impact assessment

A screenshot of a computer

Description automatically generated

13. You are managing a project for a client to move a data center and call center offshore. Many changes have been made throughout the project, but you notice that during meetings team members frequently refer to different versions of the same document, which is causing confusion. What would have prevented this?

A). Implementing an adequate configuration management system

A screenshot of a computer

Description automatically generated

14. You are managing a project using a new approach for your organization. There are three distinct phases that are divided into several short iterations, and each iteration will deliver a valuable product to the organization. What are these products best described as?

A). Minimum business increment

A screenshot of a computer

Description automatically generated

15. Which of the following are not components of the project management plan? (Choose two.)

A).

1. Risk register

2. Requirements documentation





16. You are near the end of a sprint when a stakeholder identifies some additional requirements they would like to include. What should you do?

A). Add the requirement to the product backlog.

A screenshot of a computer

Description automatically generated

17. Which of the following is not documented in the project charter?

A). Team ground rules

18. Regarding change, the project manager’s attention is best spent doing which of the following?

A). Preventing unnecessary changes

A screenshot of a computer

Description automatically generated


1. You are part of the way through a project, but before you can move to the next stage, you need to get approval from a local government agency. What direction of influence does this government agency fall into in relation to your organization?

A). Outward

A screenshot of a computer

Description automatically generated

2. You are the project manager of a new project, and you know from past experience that one of the key stakeholders on the project constantly requests changes throughout a project. You want to avoid this situation. What should you do?

A). Involve the stakeholder as early as possible and request their input regularly throughout the project.

A screenshot of a computer

Description automatically generated

3. Which is the best way to meet stakeholders’ expectations?

A). Keep stakeholders regularly informed throughout the project.

A screenshot of a computer

Description automatically generated

4. When should you stop identifying stakeholders on a project?

A). When the project is closed

A screenshot of a computer

Description automatically generated

5. You are determining your stakeholders’ current engagement levels compared to where you want them to be. Which of the following would help you determine these levels?

A). Stakeholder engagement assessment matrix

A screenshot of a computer

Description automatically generated

6. Which of the following tools might you use to identify stakeholders throughout your project? (Choose three.)

A).

1. Questionnaires and surveys

2. Expert judgment

3. Meetings



7. From the following table, which stakeholder will be the project manager’s highest priority stakeholder to reach out to?

A)

or

A). Stakeholder A


8. A new stakeholder has been identified on your project, and you are trying to determine the best approach and strategy to involve and collaborate with this stakeholder. Which artifact should you refer to?

A). Stakeholder engagement plan

A screenshot of a computer

Description automatically generated

9. Your project is currently over budget and behind schedule, and you are looking at the stakeholder engagement assessment matrix. From this document, what indicates to you that you need to take some action to engage and communicate with the stakeholder?

A). The C and D are in different columns.

A screenshot of a computer

Description automatically generated

10. A senior decision maker on your project has recently left your organization and is no longer impacted by the project, nor will this person have any influence on the project. What should you do next?

A). Update the stakeholder register identifying this person as a non-stakeholder.

A screenshot of a computer

Description automatically generated

11. If senior management doesn’t want you to spend time writing a project charter because they don’t see the value, what should you do?

A). Review the benefits of the project charter with them.

A screenshot of a computer

Description automatically generated

12. Which of the following stakeholders is the highest priority for the project manager?

A). Definitive stakeholders

A screenshot of a computer

Description automatically generated

13. When should you identify stakeholders on a project?

A). Throughout the project

A screenshot of a computer

Description automatically generated

14. Who would least likely be considered a stakeholder in the following situations?

A). A technical expert whom you sometimes refer to for advice

 

15. As you are performing data analysis of your stakeholders, it becomes apparent that some stakeholders are resistant to this project. You find this resistance surprising because this project would benefit those stakeholders. What would be the best approach to handle this situation?

A). Schedule a meeting with them and clearly outline the goals of the project as per the project charter and discuss the items in the benefits management plan.

A screenshot of a computer

Description automatically generated

16. A stakeholder is requesting project status daily but has no decision-making responsibilities on the project. How would you classify this stakeholder on the power and interest grid?

A). Keep informed

A screenshot of a computer

Description automatically generated

17. Of the following, who would be considered a stakeholder on a project? (Choose all that apply.)

A). Choose all that apply



18. A stakeholder has power, legitimacy, and urgency. How would you classify this stakeholder?

A). Definitive stakeholder

A screenshot of a computer

Description automatically generated

19. You are analyzing a document and notice that one of your stakeholders is unaware of the project, but you want them to be supportive. What document are you most likely analyzing?

A). Stakeholder engagement assessment matrix

A screenshot of a computer

Description automatically generated

20. A new director joins your organization, and you know that this director’s division will be highly impacted by your project. What should you do next?

A). Update the stakeholder register

A screenshot of a computer

Description automatically generated


1. You are an agile coach attending a meeting at the beginning of a release, and you observe that the meeting has been quite productive. The team and the product owner collaborated to determine the priority of user stories to develop the product backlog, and now the team facilitator is determining the definition of done that should be used for rest of the project. What comment would you give to the attendees of this meeting?

 

A). Advise the team and the team facilitator that they should work with the product owner to determine the definition of done.

2. You are the PM on a project developing a new model of smart doorbells. The doorbell will record short video clips of activity and send alerts to the user’s phone app. It will also have a function to recognize faces and automatically unlock the door for “approved” people. The project has been progressing well, and you are now in the testing phase but have already encountered some issues with the facial recognition feature of the doorbell. Your customer contact is observing some of those tests and performing some light testing themselves but is not providing any feedback or comments to the team because they know that testing is not complete. The team lead has informed you that the root cause of the problem been discovered and will take an additional 15 hours to fix. Which of the following is true?

A). The customer is validating scope.

3. Your team is on track to finish your project by the end of the year, but your customer informs you that due to a new discovery, the project has to finish a month earlier. Which artifact would you update to reflect this change?

A). Scope statement

4. Because your stakeholders are requesting additional features that they would like to add that were not part of the original scope of the project, you are analyzing the scope of these additions and ensuring these requests go through the proper change control channels. Which of the following would best describe what you are doing?

A). You are controlling the scope of the project.

5. Which of the following are components of the scope baseline?

A). WBS dictionary, WBS, scope statement

6. Which of the following agile ceremonies and predictive processes are closely related?

A). Iteration Review and Validate Scope

7. Senior management is asking about the purpose of a work breakdown structure. Of the following, what do you not tell them?

A). The WBS shows dependencies between work packages.

8. Senior management has decided to increase the scope of your project. Which of the following would you need to consult to determine the next steps?

A). Scope management plan

9. You are managing a project to create a new online shopping portal for your client, who has an international reach. Your team lead, Michael, realizes that the checkout page could be improved by the addition of a currency conversion function. Adding this function requires minimum effort, so he decides to add this in. What mistake did Michael make?

A). This is gold-plating and should have gone through the change control process.

10. You have been notified that a new senior director has joined your organization, and this director’s division will be impacted by your project. You update the stakeholder register and then reach out to the new senior director, who tells you that there are new processes for collecting requirements from the managers of this division. What should you do next?

A). Update the requirements management plan.

11. A team member hears the term Validate Scope and is confused as to its purpose. Which of the following is not a response you would give to this team member?

A). The purpose of Validate Scope is to allow the team to test the deliverable to ensure it meets all requirements.

12. Common scope failures on projects are a result of which of the following? (Choose all that apply.)

A). Choose all that apply



13. You have been reassigned to manage a project after the original PM suddenly quit. As you begin to familiarize yourself with the project, you notice that some of the functionality implemented was not part of the original project scope, and you don’t understand which requirements these activities relate to. How could the original project manager have avoided this situation?

A). The original PM should have created a requirements traceability matrix.

14. You notice that two team members are having a really hard time implementing their user stories. As you investigate further, you realize that both user stories are large and complex, so the challenge is not surprising. What should you do to address this problem?

A). Break down the large user stories into smaller user stories.

15. Which of these is an example of a user story?

A). As a call center analyst, I want to input customers’ first and last names and postal codes so that I can pull up their accounts quickly.

16. Which of the following tools can be used for requirements elicitation? (Choose two.)

A).

1.  Observation

2. Interviewing



17. You are the project manager of a systems implementation project. Your team has started testing a deliverable with the customer observing the process. The testing has uncovered many defects that are all being duly noted and submitted back to the appropriate technical team members to fix. Some of these fixes have an impact on the project, so you are performing an impact analysis and submitting the request to the CCB. Which of the following statements is correct?

A) The PM is controlling the scope, the team is performing quality control, and the customer is performing validate scope.

18. Which of the following are not part of the scope baseline? (Choose two.)

A). 1. Requirements

2. Tasks



19. You are the team facilitator of an inexperienced but motivated agile team. The team is asking about the methods they should use to prioritize their user stories and tasks. What should you tell them? (Choose two.)

A).

1. They should use the 100-Point Method, which distributes 100 points across the user stories.

2. They should use Paired Comparison to prioritize various factors at a time.



 

1. Which of the following scheduling tools would you use on an agile project? (Choose two.)

A).

1. Iterative schedule with a backlog

2. On-demand scheduling



2. As team members work with the product owner to prioritize user stories, it has become obvious that they need a better understanding of the requirements because this is a new technology that they are not familiar with. What is the best approach to handle this situation?

A). Create a spike experiment for further investigation.

3. You are coaching your junior project managers and are trying to determine the duration of activities. You need to deliver the final product on the deadline date, but some uncertainties can affect the estimated duration of activities. Which of the following is the best tool to use?

A). Three-point estimating

4. The customer has set a strict project deadline of 85 days for completion. As you review the project schedule, you notice that one of your paths has a total float of 11 days, and another has a total float of 14 days. Your critical path has a total duration of 55 days, and one of your activities has a free float of 5 days. What is the project float?

A). 30 days

5. You have an expected activity duration of 26 days, optimistic value of 18 days, and pessimistic value of 67 days. Calculate the PERT.

A). 26 days

6. You have been told to use the critical path method using the zero-method rule with a tolerance limit of +/− 10 percent. Where would you document this?

A). Schedule management plan

7. Which of the following would be considered activities as opposed to a work package? (Choose two.)

A).

1.  Check vendor references

2. Order windows



8. You need to develop a new website for a large customer that is in the business of selling many types of household products. You know that your organization did a similar project for a similar organization and that website took six months to develop. You therefore estimate that this project will take about six months as well. Which estimating tool do you use?

A). Analogous estimating

9. What type of dependency is being described in the following situation? You are managing the modernization of a local high school building. You are about to begin the process of completely removing and remodeling the home economics classroom. The update involves removing all the current gas cooktops and replacing them with safer electric induction cooktops. To safely remove all the cooktops, you must first disconnect all the gas lines.

A). Hard logic

10. You are the manager on a project to build a new wing for the local hospital. The ribbon-cutting ceremony is set, and many high-profile local dignitaries will be present, so the deadline is set firm and approaching fast. Unfortunately, the project is behind schedule. You work with your customer to discuss the best way to bring the project back on track, and the customer decides to crash the schedule. Of the following, which is the greatest concern to you?

A). Finding the additional resources to perform the work

11. Your team is using an adaptive methodology and planning the current release. Which of the following would be the most relevant here?

A). Product roadmap

12. In which of the following methods do team members pull the work from a queue?

A). On-demand scheduling

13. Your project is running behind schedule, but you have plenty of float on some activities. You decide to move resources from noncritical path activities to critical path activities. What are you performing?

A. Resource smoothing

14. Your initial plan was to finish all configuration work before testing would start. However, due to some delays, you have decided to start testing even though configuration is not yet complete. Which of the following would best describe this situation?

A). You have changed a finish to start to a start to start relationship.

15. A junior project manager and a key stakeholder are in disagreement. The junior PM delivered the WBS to the stakeholder, who is very upset that it is incomplete. It is missing the activities, and the stakeholder wants to know how this basic mistake could have happened. How should you, as the senior PM, handle this situation?

A). Explain to the key stakeholder that the junior PM is correct not to include activities.

16. You need to clear a parking lot covered in snow and decide one person should start clearing the snow before the other person starts putting down rock salt. What relationship does this best describe?

A). Start to start

17. Your customer has approached you and told you that you now need to finish the project two weeks earlier than anticipated. What does this mean in terms of the critical path?

A). You have a negative float of two weeks.

18. You are managing a project where the product has to be delivered by a deadline that cannot be extended. You notice that one team is consistently working a lot of overtime while other teams are sometimes working less than 40 hours per week. What should you do to ensure team members’ work is spread across teams evenly?

A). You should use resource smoothing to ensure team members are optimally utilized.

19. You are managing a project to install a large machine in a manufacturing plant. You cannot start testing the machine until the machine is fully installed and configured correctly. What dependency does this describe?

A). Mandatory

 1. You are reviewing an artifact that documents the formulae to use to calculate the budget, the acceptable budget tolerance range, and units of cost measurement. Which artifact are you reviewing?

A). Cost management plan

2. You are halfway through the project and have been given a new set of formulae to determine the financial health of your project. Where would these formulae be documented?

A) Cost management plan

3. You are in a meeting with some team members and discussing material costs for certain activities. Your team is tasked with painting 100 rooms for a large hotel. One of your team members thinks that each room should take about four hours to complete, including the closets, bathrooms, and all the edges and corners and should use about two gallons of paint. You know the cost each gallon of paint and the charge-out rate for each team member. What is the best estimating tool to use in this case?

A). Parametric estimating

4. You are on your third sprint, and senior management is concerned that you have not created a cost baseline yet for your project. They want you to immediately start work on creating the cost baseline. What should you do?

A). Explain to senior management that a cost baseline is not needed for this project.

5. Penny is compiling a list of costs incurred so far on a project. She must categorize these costs so that she can present the amount of direct cost incurred. Which of the following should Penny include in this list?

A). Travel expenses to the customer’s office

6.  Which of the following are included in the cost baseline? (Choose three.)

A).

1. Activity cost estimate

2. Work package cost estimate

3. Contingency reserves



7. You are estimating the cost of an activity on your project, and you come across some documentation from a prior project that would be very helpful. This activity is almost identical to the activity performed on that prior project, so you can use those figures as a direct comparison, especially in terms of scope, risks, and project team requirements. Which of the following tools provides the most accurate cost estimates?

A). Bottom-up estimating

8. You are hosting a project kickoff meeting for a high-visibility project that has a fixed deadline. Discussions include high-level scope, budget, schedule, and stakeholder involvement. A senior manager insists on a detailed budget so that they can estimate cash flows for the organization. How should you respond?

A). Advise senior management that the best you can do at this stage is a rough order of magnitude (ROM) range of −25% to +75%.

9. You are on a project to develop an aircraft engine and are working on finalizing the costs for work packages, activities, and contingency reserves. Which tool are you utilizing?

A). Cost aggregation

10. Which of the following would be an indirect cost on your project?

A). Benefits for employees in your organization

11. You have rolled onto a project where the customer has not been very happy with the progress. The scope of the project has not been defined very clearly, there are many versions of the same documentation, and stakeholders do not feel engaged on the project. Which document do you review to determine how to manage negative cost variances?

A). Cost management plan

12. How would you best classify the cost of raw materials on a project?

A). Direct

13. As project manager, you are working on finalizing the costs for all the work packages, activities, control accounts, and contingency reserves. Which document do you produce as a result of this effort?

A). Cost baseline

14. What is a rough order of magnitude (ROM) range on an estimate of $200,000?

A). $150,000–$350,000

15. You are in a meeting with team members to discuss the costs of activities. Your team will be painting 250 rooms for a large hotel chain. An experienced team member states that, based on historical experience, each room should take about three hours to complete, and from this number, you can figure out how long the whole project should take and how much it should cost. What is the best estimating tool to use in this case?

A). Parametric estimating

16. You are finalizing the costs for work packages, activities, and contingency reserves. Because this is such a large project, there are many phases and deliverables for this project, and each stage of the project requires a separate approval and sign-off. For this deliverable, you have estimated a total cost of $930,000. The senior management staff has informed you that they will be able to release only $310,000 per quarter, so you should plan activities accordingly. Which tool do you employ to do this?

 

A). Funding limit reconciliation

17. You are comparing actual results to the plan and making calculations to determine the project’s rate of performance. What are you doing?

A). Controlling costs

18. Earlier on this project, your team lead expressed concerns that a vendor may delay shipment of some vital raw materials for the project due to factors beyond their control. If these raw materials are not delivered on time, the entire project would come to a halt until they could be delivered. You have come to a critical point on the project, and the vendor informs you that they indeed need to delay this shipment due to these exceptional circumstances. You decide to order these raw materials from a different vendor who is going to charge a lot more. Where would you get the additional funding for the more expensive raw materials?

A). Contingency reserves because this is a known risk

19. Your customer is requesting a detailed and accurate cost estimate for an upcoming deliverable. Which of the following would you most likely use?

A) Bottom-up estimating

20. You are delivering a cost estimate to your customers, and it has taken some time to estimate. However, the customers are pleased with the estimate because there is an accurate breakdown of each detailed cost category, and they feel they are in a much more informed position to make the right decision. What estimating tool was most likely used here?

A). Bottom-up estimating


1. Per PMI, what are the three processes that comprise planning for and acquiring project resources?

A). Plan resource management, estimate activity resources, acquire resources

2. Which tools can be used by a project manager to assess the fit for any potential candidate for a project role? (Choose all that apply.)

A).

1. Attitudinal surveys

2. Structured interviews

3. Ability tests



3. Which element is not normally part of a project’s resource management plan?

A). A listing of the resource requirements for the project

4. Why is critical thinking an important attribute for all project team members? (Select all that apply.)

A).

1. Improves ability to understand how the use of language impacts others

2. Decreases the impact of bias, unstated assumptions, and emotional appeals

3. Prioritizes analyzing data and evidence to evaluate arguments and resolve issues

4. Improves ability to identify root causes of problems



5. Which statements reflect a servant leadership mindset? (Choose all that apply.)

A).

1. Seeks growth and improvement in all team members

2. Exhibits a strong integrity principle

3. Emphasizes a coaching approach to managing people

4. Encourages collaboration and trust

5. Takes the perspective of others and maintains the best interest of others



6. What is the primary value of planning resource management for a project?

A). To establish the approach and the management effort level needed for managing project resources based on type and complexity of the project

7. What are three management techniques that can improve team performance?

A). Develop a team charter, set up a team collaboration environment, share leadership responsibilities

8. In what ways does an effective project manager demonstrate leadership? (Select all that apply.)

A).

1. Shields the project team from the politics and noise surrounding the project

2. Looks for ways to motivate each team member and help them improve

3. Takes responsibility and accountability for the project

4. Exhibits a calm, confident aura when others are showing signs of issue or project stress



9. What variables can impact the leadership style needed on a given project?

A). Team experience level with type of project, maturity level of the project team, organizational governance structures, and location of project team members

10. In which stage of the Tuckman Ladder team development model do initial conflicts emerge?

A). Storming

11. What are some characteristics of high-performing teams?

A). They trust each other, collaborate well together, and accomplish more as a combined group than they could collectively as individuals.

12. What approaches are key to effectively address and resolve conflicts?

A). Keep communications open and respectful, focus on the issues (not the people), focus on the present and the future (not the past), and search for alternatives together

13. Which action item by the project manager may not help a new team member to be as productive as soon as possible?

A). Assign them a challenging work assignment as their first task.

14. What are some management principles that can maximize team performance?

A. Set clear expectations, recognize and reward, facilitate team synergy

A). 

15. What are the four primary components of leadership skills per PMI?

A). Establishing and maintaining vision, critical thinking, motivation, and interpersonal skills

 

16. What are the four aspects of emotional intelligence?

A). Self-awareness, self-management, social awareness, and social skill

17. What are examples of other team members, besides the project manager, providing leadership on a project? (Select all that apply.)

A).

1. The project sponsor influencing organizational politics and providing commitment to the project plan

2. The product owner influencing and guiding stakeholder expectations

3. Senior management championing the business process changes that will result from the project to the impacted stakeholders

4. The technical leaders providing input on the direction and plan for the project



18. A project manager who remains calm under pressure, thinks before they act, can put themselves in the other person’s shoes, and naturally builds rapport with other people is exhibiting what skill?

A). Emotional intelligence

19. What is a benefit of making project decisions with the team?

A). It leverages the knowledge, expertise, and experience of diverse individuals.

20. What are some ways a project manager can earn the respect of the project team and other project stakeholders? (Choose all that apply.)

A).

1.Show respect to them.

2. Be fair in how you make decisions and deal with conflicts.

3. Openly confront the realities of the project situation

4. Demonstrate the behaviors you want others to emulate

5. Actively listen to each person you interact with



21. What are some actions that the project manager can take to maximize productivity of the team? (Choose two.)

A).

1. Ensure work assignments are clear and understood.

2. Provide the tools, resources, and procedures to facilitate team collaboration.



22. What is a recommended first action step when dealing with poor performers on the project team?

A). Verify the expectations the individual had for their current assignment.

23. Which approaches for conflict management as described in the Thomas-Kilmann model are most common for conflicts within a high-performing team? (Choose three.)

A).

1.Compromising

2. Collaborating

3. Confronting/Problem-Solving



24. What term is used to describe the Tuckman Ladder team development model?

A). Forming, Storming, Norming, Performing


1.You are a team facilitator mentoring a junior team member. You are showing this team member a chart that shows what user stories are yet to start, what has been started, and what has been finished. What chart are you showing the team member?

A).  Kanban board

2. You have created a shared drive to ensure the latest versions of project documentation are available to all team members. The communication method described here is which of the following?

A). Pull

3. Your team member Cathy phones you after a brief meeting from one of the stakeholders’ offices. She informs you that she has encountered some resistance in collecting important project information needed. As the PM, you give Cathy some detailed instructions on how to get the necessary information. To ensure Cathy has fully understood the instructions, you should do which of the following?

A). Ask Cathy to repeat the instructions back to you.

4. Two team members from different parts of the world are having a conversation, but both are misinterpreting gestures and phrases due to cultural differences and accents. This is an example of which of the following?

A). Noise

5. David is managing a high-visibility project, but there is much confusion between stakeholders on the progress and status of the project. He has been careful to ensure that all possible information about the project has been available to all the stakeholders, but many stakeholders are unable to interpret the results that don’t pertain to them. How could David have avoided this situation?

A). David should have understood the information needs of the stakeholders and should have sent them only the relevant information they need.

6. You are having a problem with a team member’s performance. What would be the most appropriate type of communication for addressing this issue with the team member initially?

A). Informal verbal

7. You are managing a military project with top secret designation. As a result, some teams are not allowed to communicate with other teams. Where would you document this constraint?

A). Communication management plan

8. Based on the sender-receiver model, who has the primary responsibility when sending the message, to ensure the receiver has received and understood the message?

A). The sender by ensuring the message has been encoded and transmitted in a way the receiver can understand

9. You are attending a stakeholders’ status meeting and presenting the project results to key stakeholders. One stakeholder mentions to you that they would now like an email summary of the project every Friday morning. What should you do next?

A). Update the communication management plan

10. Video conferencing is a type of which communication method?

A). Interactive

11. Which of the following are enhancers of communication? (Choose two.)

A).

1. Active listening

2. Timely



12. You are managing a large project with many global teams. Recently, you have noticed that some team members are not receiving the information they need, some are not being invited to meetings, some are not receiving the reports they need, and some team members are receiving the wrong reports. In this situation what should you do first?

A). Review the information distribution detailed in the communication management plan.

13. In which of the following situations would formal written communication not be valid?

A). Taking notes during a stakeholder’s status meeting

14. One of your team members has not been very responsive in emails and work requests recently, and has not been timely in resolving issues assigned to her. As the PM, you want to understand what the problem is. What type of communication should you initially utilize in this situation?

A). Informal verbal

15. You are a team facilitator, and a key stakeholder is requesting regular status updates of your project. What should you do?

A). Give them access to the information radiator.

16. You are managing 15 analysts and developers on your project, but 2 more are added. How many more communication channels are there?

A). 33

17. During a meeting with stakeholders, two of the stakeholders tell you that they never received the report that you are presenting. The other stakeholders did receive them, and you confirm that the two stakeholders were on the distribution list. You didn’t print any spare copies of the report because it is a very large document with more than 50 pages. The two stakeholders are visibly upset but later realize the report went into their junk mail. What could have prevented this situation?

A). You should have followed up with all the meeting attendees to confirm they received the report.

18. Which of the following are not among the 5 Cs of written communication? (Choose two.)

A).

1. Communicating relevant information

2. Compilation of information from available sources



19. Repeating the message is an example of?

A). Feedback

                                        WEEK-5 QUIZ 11

1. Match the terms on the left to the scenarios on the right.

A).


or




2. You notice that one of the machines on the production line is working inefficiently and has produced several defects. Some of the defects need to be scrapped, but some can be repaired. You issue a change request to have the machine fixed, which is approved. This action would be referred to as

A). Corrective action

3. You managed a project to remodel a customer’s house. After only a month, the customer calls you complaining that the internal doors are not aligned correctly and do not close properly. When you check, you realize that the wrong size doors were installed, and you need to replace them all. The costs incurred in replacing the doors would be considered which of the following?

A). External failure cost because the product has been delivered to the customer

4. How would you classify the cost of product recalls?

A). External failure cost

5. Many issues on your project need to be resolved, and you want to identify a way of prioritizing these issues so that the team can fix the root causes that are creating the greatest number of issues. What tool will you most likely use?

A). Pareto chart

6. One of the characteristics of an agile project is that the team is continuously trying to find ways of improving efficiency. Which of the following ceremonies would be most closely aligned to Kaizen?

A). Sprint retrospective

7. Your team is in the testing phase of a project, and they have identified test cases and scenarios and are now performing tests to ensure the system is working correctly. Another group is conducting a review of your team’s work to ensure project procedures are being followed. What tool is being employed by this other group?

A). Audit

8. Iteration retrospectives can be used for continuous improvement. True or False?

A). True

9. You are looking at a control chart and notice that a few data points are falling on the mean, some data points are grouped together above the mean but below the upper control limit, and some are grouped together below the mean but above the lower control limit. Which of the following statements is true?

A). The data points that are grouped together are precise, but the data points on the mean are accurate.

10. The upper control limit is set to 400, and the lower control limit is set to −300. The upper specification limit is set to 280, and the lower specification limit is set to −280. You have a data point that is at 375. Which of the following is true?

A). The process is within statistical control, but the customer’s requirements are not being met.

11. There are different factors causing a particular issue, and you want to find the root cause. You look at a chart that lists all possible causes of the issue and drills down each possible cause asking a certain number of “whys.” Which tool and technique would be best suited to test a representative sample of the population?

A). Statistical sampling

12. Which of the following is an out-of-control situation?

A). You see one data point above the upper control limit.

13. After a lengthy discussion and debate with your stakeholders, you have finally agreed on the quality standards that the team must abide by for the next project. What should you, as the project manager, do next?

A). Update the quality management plan.

14. You are in a meeting with your team members and are discussing the acceptable tolerance levels regarding the quality of deliverables. One team member states that the acceptable range should be within 2.5 percent, whereas others state 3-sigma. What should you advise?

A). They should consult the quality management plan.

15. One of the machines your team uses to test deliverables has broken down and needs to be fixed. This action would be best referred to as which of the following?

A). Corrective action

16. You have been reassigned to an existing project replacing the current project manager who has left the organization. You want to determine the quality goals and objectives for the project. What should you do?

A). Review the quality management plan.

17. You are working with your team to resolve a perplexing issue and need to get to the primary cause. Which tool will you most likely use?

A). Ishikawa diagram

18. Which of the following quality concepts were promoted by Crosby and Juran, respectively?

A). Zero defects, fitness for use

19. The quality assurance team is reviewing documentation to ensure your team has followed procedures and to identify any abnormal variations. What are they doing?

A). Audit

1. When the project team is dealing with threats, which risk response strategies will require more effort?

A). Risk avoidance and risk mitigation

 

2. What are common acronyms used to describe common sources of project risks?


A). 
PESTLE, TECOP, and VUCA

3. During risk identification, the project team discovered an opportunity to reduce the project cost by 30 percent. Due to this potential savings, the project team decided to make sure this opportunity occurs. What risk response strategy are they employing in this scenario?

A). Risk exploitation

4. The project team documents in the risk management plan that it will use risk classifications of scope, schedule, cost, and quality. What type of risk classification is this?

A). Effect-based

5. Which risk management processes use the risk register and the risk report?

A). They are used by all the risk management processes throughout the project.

6. What are some other factors besides probability and impact that should be evaluated before assigning a final priority level to a given risk?
A). 
Urgency, proximity, and propinquity

7. What are some examples of quantitative risk analysis tools?

A). Simulation, sensitivity diagrams, and influence diagrams

8. Which of the following is NOT an objective of the risk monitoring process?

A). Implement the agreed-upon risk response plans.

9. Which risk analysis tool is used to determine which risks have the greatest impact on the project’s critical path?

A). Monte Carlo simulation

10. Which of the following statements are true about the risk management plan? (Choose two.)

A)

1. It documents how risks will be managed and controlled for the project.

2. It often contains sections describing the risk strategy, the risk categories to be used, and the definitions for risk probability and impact to be used.



11. If an organization is comfortable with most uncertainty and accepts risk as a normal part of doing business and projects, how you would describe the risk appetite of the organization?

A). Risk-tolerant

12Risk A has a probability of 50 percent and an impact score of 9. Risk B has a probability of 60 percent and an impact score of 8. Risk C has a probability of 90 percent and an impact score of 6. Risk D has a probability of 30 percent and an impact score of 10. Which risk will be ranked the highest?

A). Risk C

13. What is the objective of qualitative risk analysis?

A). To prioritize and rank the identified risks so the project can focus on the high-priority risks

14. What are some of the reasons organizations do not leverage quantitative risk analysis during the risk analysis process? (Choose three.)

A).

1. It requires additional time and investment.

2. It requires high-quality data for each individual project risk.

3. It requires a solid baseline for scope, schedule, and cost.



15. What is the difference between a threat and an opportunity?

A). Threats are risks that can negatively impact project objectives. Opportunities are risks that can positively impact project objectives

16. By considering the uncertainty level of both the requirements and the technical solution for the project, the project manager refers to the Stacey complexity model and determines the project falls into the Complicated range. What project approach does the Stacey complexity model recommend in this situation?

A). Adaptive approach

17. Due to the potential impact to multiple project objectives, the project team has decided to take action to eliminate a particular risk. Which risk response strategy have they selected?

A). Risk avoidance

18. What are the response options for dealing with threats?

A). Escalate, Transfer, Accept, Avoid, and Mitigate

19. What is secondary risk?
A). 
A new risk resulting from the implementation of a risk response plan

20. What is the difference between risk appetite, risk threshold, and risk tolerance?

A). Risk appetite describes the general attitude of the organization regarding risk, risk tolerance defines how much impact the organization will accept, and risk threshold defines the impact point where the risk will no longer be accepted


1. Your vendor hired one of their subcontractors, who has severely underperformed. You have reached out to the subcontractors several times, but they have completely ignored you. Which of the following is true?

A). The subcontractor is within their right not to respond to you.

2. Which of the following would be an example of an administrative change to the contract?

A). The phone number for the contact person has changed.

3. A potential customer is interested in purchasing a significant number of batches of your flagship product, which will require you to procure additional equipment to fulfill this order. The potential customer sends you a letter of intent so that your company can get a bank loan to procure the additional equipment, but the bank rejects the loan application. What is the most likely reason for the rejection?

A). A letter of intent is not a legal document.

4. Which of the following tools would you utilize to look for potential vendors to discuss the project and receive proposals from?

A). Advertising

5. You are an IT project manager for an organization where senior management is risk averse. Partway through an implementation project, you decide that some activities need to be outsourced to a vendor due to lack of resources in your company. Which type of contract should you negotiate?

A). FFP

6. Your senior stakeholders want you to select a small local vendor to perform an activity that you are planning to outsource. Which of the following is true?

A). This is source selection criteria.

7. You have decided to outsource the work and sign a CPPC contract with a vendor. What will be your biggest concern throughout the project?

A). Cost

8. You have a dispute with one of your vendors regarding the work they completed and the work that was agreed to. What should you do to determine the next steps to resolve this dispute?

A). Refer to the contract with the vendor.

 

9. You are managing a construction project for an office building and need 10,000 square feet of carpeting. The customer prefers a standard design that is available from several suppliers. Which of the following is the best bid document to use?

A). RFQ

 

10. You have hired a vendor to perform certain activities on your project. Which of the following is not true regarding early termination?

A). Your vendor can terminate the contract for convenience.

11. You need to purchase 500 windows of equal size for a hotel construction project. What type of bid document should you submit to the vendor so that they can send you a quote?

A). RFQ

12. You are trying to determine whether to outsource an activity to a vendor by considering the cost implications, availability of resources, and the schedule. What are you performing?

A). Make or buy analysis

13. You have decided to outsource an activity to a preferred vendor. Which of the following is true?

A). This is known as single source contracting.

14. Match the contract types on the left to the scenario on the right.



15. Your vendor requests a change to the contract. They were waiting for important data and details on requirements from one of your teams before they could start work on their activity. However, it has been several weeks since the request, and they still have not received the information they need, which will now jeopardize the deadline. They are asking for an extension to the deadline. What should you do?

A). Extend the deadline due to a constructive change.

16. In which of the following situations will a force majeure clause apply? (Choose two.)

A).

1.  There is rioting in the area.

2. A sudden tornado touches down in the area



17. You are in a meeting with several potential sellers for an agile project. Most likely, which meeting is this?

A). Bidder's conference

18. Which of the following is not an advantage of centralized contracting?

A). Project dedicated procurement resources


1. The final project report contains all of the following information except which one?
A). 
A summary and official authorization for the project to begin

 

2.
Your software development project is reaching its end. This is a completely new system that is replacing the old legacy system, and no one in the organization has ever used this new system before. You are demonstrating the final system capabilities to key stakeholders before you go live, and they are very impressed with what they are seeing. They agree that the system is ready to go live. What should you do next?

A). Ensure the organization is ready to go live.

 

3. When should the project manager prepare the final project report?

A). All of these.

 

4. You are in a meeting with your team members, and some key stakeholders are observing. The team is discussing what went well and what can be improved. They also briefly discuss the next two-week iteration. What meeting are you attending?

A). Sprint retrospective

 

5. The project team has completed the third phase of the project, and the project manager is in a meeting with other key stakeholders to review the project and discuss its future. Due to several external factors and major risks, they decided to cancel the project. This review and the subsequent decisions are best referred to as what?

A). Phase gate and kill point

 

6. All the following can occur as part of closing a project, or a phase, or an iteration, except which one?

A). Validation of scope

 

7. Which of the following are not appropriate reasons for canceling a project? (Choose two.)

A).

1. The customer requests a significant number of additional requirements

2. Material prices have significantly increased, resulting in the project costs doubling the original cost baseline.



 

8. After the customer has accepted the final deliverable, what should the project manager ensure happens before transferring to ongoing operations?

A). Transition readiness

 

9. You are in the process of administrative closure and have collected project records, ensured vendor contracts are closed, and prepared the final report. What should you do next?

A). Archive project documents

 

10. Which of the following is not included in the transition plan?

A). Procedures for customer acceptance

 

11. Which of the following is not included in the transition plan

A). Procedures for customer acceptance

 

11. Your organization has recently moved to an adaptive project environment. You are coaching the team and advising key stakeholders who have no prior agile experience. They are trying to understand the closing process in agile. How would you advise them?

A). Explain that the closeout occurs during the sprint retrospective.

 

12. Which of the following are benefits of the administrative closure process? (Choose two.)

A)

. 1. Project information is archived.

2. Team members are released to pursue new endeavors.




1. Which of the following does not represent the SMART criteria?


A). 
Analytical

 

2. Which of the following would be work performance information?

A). You are 5 percent behind schedule.

 

3. Which of the following would not be examples of a chart or report that you would use to track performance? (Choose two.)

A).

1. Ishikawa diagram

2. Pareto chart



 

4. A project manager collected metrics such as CPI, SPI, CV, number of defects, and number of tasks done and is now converting and formatting these metrics into charts and graphs. What is the project manager doing?

A). Developing work performance reports

 

5. Match the performance tracking tools and charts to the descriptions.

A )



 

6. Your project has a CPI of 1.09 and SPI of 1.06. You have a CV of $34,300 and an SV of $29,200. Your clients have a strict deadline and are cost sensitive. Even at this stage of the project, they are concerned about these results and are asking you to find ways of getting back in line with the project management plan. What advice should you give your clients?

A). Your project is under budget and ahead of schedule, so the clients have nothing to worry about at this stage. You should inform them of this misunderstanding.

 

7. The planned value for your project is $2,000 per week, and you are told that SV= −$2,000. How would you interpret this?

A). 
You are behind schedule.

8. Which of the following is not a reason for taking performance measurements on a project?

A). Performing an impact analysis of changes

 

9. Which of the following are common project KPIs? (Choose all that apply.)

A). Choose all that apply



 

10. You have the following metrics on your project so far: PV = $63,000; EV = $61,000; AC = 62,000. Which of the following is true?

A.) You are over budget and behind schedule.

 

11. Which of the following metrics shows that the project is on budget and on schedule?

A). CPI is 1 and SPI is 1.

 

 

12. Which of the following terms measures the cost efficiency you have achieved so far?

A). CPI

 

13. A project manager diligently measured progress of a project by taking many performance measurements. These measures were promptly documented and filed away. The project went over budget and behind schedule, which came as a surprise to key stakeholders. However, the project manager showed them the performance measures that were taken, so this shouldn’t have been a surprise to anyone. What advice would you give to this project manager?

A). These measures should have been communicated to key stakeholders as they became available.

 

14. Which of the following would you not find on an information radiator for an agile team?

A). Gantt chart

 

15. You have been delivering system functionality in increments to your organization, and key stakeholders want a report that details the user’s satisfaction of the system so far. You are trying to determine the best approach for this and will decide on which of the following tools?

A). Net promoter score

 

16. Which of the following tools do you use to gauge stakeholder satisfaction?

A). Net promoter score

 

17. The team facilitator is discussing with key stakeholders the status of the project and showing them the tasks that are remaining, the tasks that are currently being worked on, and the ones completed. Most likely, which chart is the team facilitator referring to?

A). Kanban board

 

18. Which of the following tools do you use to show the number of story points that have been accomplished by the team?

A). Burnup chart

 

19. Your project has a BAC of $45,000, AC of $23,450, CPI of 1.09, and SPI of 0.93. What do these numbers tell you about the project?

A). You are under budget but behind schedule.

 

20. Which of the following are types of key performance indicators (KPIs)? (Choose two.)

A).

1.  Lagging indicators

2. Leading indicators


 

 

 

 

21) Match the performance tracking tools and charts to the descriptions.

A).






week-8 quiz 16


1. Which of the following is not a tailoring process step?

A). Following the ADKAR Model




 

2. Which of the following would least likely result in an organizational change management project?
A).
Systems upgrade

 

3. You are a well-experienced project manager who has successfully managed many projects in the past. You are now managing a project in a foreign country that you have never been to before, and the culture is different to what you are used to. Due to these cultural differences, some team members have not been responsive to some of your requests. What should you do?

A). Adjust your leadership style according to the culture.

 

4. You are managing a project to implement a business change to your organization. In doing so, you are documenting the plan for knowledge transfer, training, and readiness activities required to implement the business change. Which document are you updating?

A). Rollout plan

 

5. Which of the following are steps in the ADKAR Model? (Choose three.)

A).

1. Knowledge

2. Reinforcement

3. Desire



6. Which of the following are benefits of tailoring the project management approach?


A). All of these.

 

7. Which of the following is not included in the rollout plan?

A). Procedures for customer acceptance of the deliverable

 

8. Who is responsible for tailoring project processes and procedures?

A). The project manager and the team




final test


1. Agile uses a far more flexible scheduling approach by using time boxes or windows between the ceremonies. Which of the following is not an attribute of agile scheduling techniques

A).  Progressive elaboration allows for details to be added during the retrospective

 

2. Which of the following is the least likely reason that work is provided in a time-box format for the majority of agile projects?
A). To ensure specific dates are met on a regular basis

3. When the organization is done developing the project results, these deliverables or features would be approved by what process tool?

A). Validation

4. What are two of the greatest benefits of using a quality audit during the project?

A).

1. It employs an outside set of eyes to determine where improvements can be made.

2. The team can determine if the project is following the organization’s policies and procedures.



 

5. Which of the following would be the most beneficial key performance indicator of team cohesion?

A). The team seems to have a healthy culture of communication and trust.

 

6. Moving from a common workspace to remote work has been more common for several years. There are a number of advantages for both the organization and the employees, including all but which of the following?

A). Increases the level of communication and trust

7. Of the following, which will be the least important to the project team member who has expressed various emotional states due to ongoing time and budget pressures?

A). Processing all conditions without expressing any feeling so as to keep things professional

 

8. Your team has been using Kanban for the duration of your current project. One of the participants who just joined the team asks what the benefits are over planned work packages. You would explain all of the following except:

A). It works well for complex dependency relationships.

9. Someone asked if the documentation of project requirements is unique to agile type projects, and you tell them, “Yes.”
A). False

10. Of the following, which situation is least likely to be appropriate for your project backlog?

A). The user will specifically request to add items to the product backlog during the iteration.

11. Which of the following occurs latest in the closing phase?

A). The project file is officially closed.

12. Agile projects have epics and features. However, when it comes to features, they may have more than one user story applied to them.

A). True

13. Predictive teams frequently have a deadline for the overall project deliverable and don’t have a lot of flexibility. For this reason, they would be most likely to use tools for a start-to-finish approach. Which of the following are most likely the visual tools used for monitoring such projects? (Choose two.)

A).

1. Gantt chart

2. Network diagram



14. At the initial stages of a project plan, the team will need to determine how delivery will be made. This could be in a single launch or delivery or could be incremental and delivered in stages. Of the following, which is not incremental in delivery?

A). The opening of a new retail store with grocery, clothing, and automotive sections

15. You are managing an Agile project and working with the team to determine the work for each sprint. When will your team most likely identify initial signs of any risks or potential issues during the sprint?

A). During the daily standup meeting

16. As the current project comes to a close, there is still about $40,000 to finish the work. The project has already spent $500,000 but was estimated originally to be $480,000. What is the “estimate to complete” from this information?

A). $40,000

17. The purpose of a bidder conference is most likely to include all of the following except:

A). The buyer provides an expected price they wish to pay.

 

18. It’s near the end of the day and you are frustrated to see that previous team members have taken shortcuts to coding, causing inefficiencies. These now need to be fixed before any of your tasks for the sprint can be started. What should you do?

A). Bring this up at the next daily standup meeting

19. The project team you manage is used to hybrid projects and shares both predictive and adaptive/agile tools with each other. The client you work with is more interested in seeing results rapidly than in long-term plans. Which of the following schedule models would be appropriate? (Choose two.)

A).
1. Task board

2. Burnup chart


20. For the past many months, the team has worked with little direction from the project manager. The team gets together and determines the work to be done, how to do it, who will do it, and what the definition of done is. This is an agile team.

A). True

21. The team has just completed an unstructured brainstorming session and determined that the ideas may fall into a series of categories. Which of the following would be the best tool to sort these into useful groupings?

A). Affinity diagramming

21. When you’re communicating with stakeholders from different organizations, many forms of noise may distract from the message. Which of the following is least appropriate to refer to as noise in communication?

A). The topic brought to the group is new in nature, even if not complicated.

22. Senior management is asking you for advice on an upcoming project. This project is very different from what the organization has been used to because it is a large project with distinct phases. However, the requirements for each phase are not clear and will change regularly due to external business factors. You need to be able to keep track of these changing requirements, but the customer wants business value delivered frequently. ______ would be the advice you would give senior management.

A). We should use a hybrid approach

23. When projects experience risk conditions, the team will record them in the ________ and then ultimately consolidate into the ___________.

A).

1. Risk repository

2. O Risk register



24. As the project manager, you will be responsible for several components of the schedule, well in advance of the execution of real work. Which of the following is least relative to the schedule management plan?

A). Stakeholder impact analysis

25. Last-minute changes were made recently to the training plan due to additional scope requirements. This is an acceptable choice to make in a predictive project.

A). True

26. Early in the project formation, the team begins to seek out stakeholders and specific requirements for their needs. Of the following, which are project stakeholder requirements? (Choose two.)

A).

1. The maximum budget provided will be set at $350,000 for this project.

2. The project must be delivered by the end (last day) of the next quarter



27. All of the following terms may be used for projects with an ill-defined scope, schedule, and budget from the outset of execution but will implement work immediately and value will be delivered incrementally and iteratively EXCEPT which:

A). Classic project management

28. The concept of continuous improvement attends to uniform sales and consistent design, and maintains product quality.

A). False

29. During the latest software release that was provided to the client, several of the newest employees were confused because there are several terms for the release. All of the following would be appropriate except:

A). Backlog burndown

30. Audits would be completed for which of the following TWO purposes?

A).

1. To assure that there is compliance with organizational requirements.

2. To offer productivity improvements on the existing project.



31. Project tolerances are usually defined early in the process and include categories such as budget, schedule, product quality, and specification limits.

A). True

32. When the development of the project has reached a point where it will be released to the end client, consumer, or general public, there is frequently a specific cutoff date or time, which is known as:

A). The go-live date

33. A new team member joined your group, and this person requires some help. It seems to them that you are not doing your job as a project manager because they expected you to give them assignments and specific due dates. However, it simply is not the way things are done within your group. What are some explanations? (Choose two.)

A).

1. This is a very experienced team, and members have all of the technical and soft skills to perform undirected.

2. The team is self-organizing and has the skills to determine who should be working on which tasks.




34. You frequently will experience situations where others are facing greater turmoil than you are. If you wish to be empathetic toward those going through challenges, you will use which approaches: (Choose two.)

A).

1. Putting effort toward providing help and recognizing needs of others

2. Carefully observing those around you and listening for situations you have been through



35. Projects that are known to have a high likelihood of change throughout the project, but a lower cost of change will likely use a number of additional tools, such as all of the following except:

A). Critical Path Method (CPM), which uses a predicted duration for the longest path.

36. The WBS dictionary is important to explain many of the work packages that the team has outlined. Which of the following items would certainly be included in a WBS dictionary? (Choose two.)

A).

1. Description of the work

2. Acceptance criteria



37. Which of the following are the correct levels of stakeholder engagement from the assessment matrix? (Choose two.)

A).

1. Unaware

2. Neutral



38. When dealing with two employees who have been bickering about a specific work task, you try to encourage them to find mutual solutions. Eventually, though, one individual decides that they just don’t want to keep discussing it and walks away saying, “You figure it out.” This would be most likely which conflict management approach?

A). Withdraw/avoid

39. You are halfway through a project and notice that during each sprint, team members do not know what tasks other team members are working on, nor are they aware of the status of tasks other than their own. What is the most likely reason for this?

A). Daily standup meetings have not taken place

40. When you’re working with your project stakeholders, there will clearly be situations in which varying styles of involvement will be necessary. All of the following are considered steps in assuring stakeholder involvement at various levels, except:

A). Avoiding overwhelming stakeholders with too much communication and limiting outreach to a minimum

41. Of the following, which two will more likely be negotiated in a project, regardless of the life cycle? (Choose two.)

A).

1. Performance expectations

2. Warranty and future support



42. As a team member, you noticed that the project manager was identifying variances during the retrospective in the last sprint or iteration. The PM is likely doing this for all of the following reasons except:

A). Having a private conversation with the individual who caused the variance

43. A Pareto chart is used for ranking causes of problems from greatest to smallest with a cumulative curve above it but does not define the root problem.

A). True

44. When you are referring to team compliance efforts, all of the following must be addressed except one that would allow tailoring. Which of the following is the exception?

A). Team development

47. The current situation the team is facing requires lot of interaction with people from start to finish. Which of these may be considered a key stakeholder as opposed to non-key stakeholders in the project?

A). The individual who asked the project manager to hire the team and perform the work

48. Of the following options, which is least likely to be included in the contract with an external supplier?

A). Outline of the project budget

49. Assuring that you are working within a high-performance team is part of the project manager’s role. Of the following, which is the least relevant to the process of working with a high-performance team?

A). Directing the team's daily activities through clear instructions

50. The project leader should be a shining example of cultural awareness, negotiation skills, and team building.

A). True

51. The risk management plan has a series of influences that keep the project team on their toes. When the team is making the initial plan, all of the following but which may be included in that plan?

A). Risk events that occur during the initial phase

52. Phases within a project may be sequential, overlapping, or a series of sequential and then overlapping, or overlapping and then sequential based on the specific tailoring of the project.

A). True

53. Two team members disagree about the purpose of the lessons learned exercise that occurs occasionally during the project. All of the following are significant aspects to a lessons learned exercise being successful except:

A). It will be highly beneficial for the short term as a learning tool.

54. Which of the following quality experts derived the concept of many small changes for improvements?

A). Kaizen

55. Risks are broken into two main categories: positive risks that are called opportunities and negative risks that are called threats.

A). True

56. When developing features into an initial list, the owner and the team will use multiple methods to determine the priority for each. Of the following, which is not one of the tools used in the agile methods for this purpose?

A). Network diagram

57. Of the following, which roles are a part of the project manager’s description during conflict? (Choose two.)

A).

1. Facilitate the discussion to allow team members to resolve the conflict.

2. Incorporate interpersonal and team skills to encourage positive responses.



58. Your organization is looking to adopt an Agile approach for the first time for an upcoming systems implementation. One of the senior managers approaches you and mentions that he had read somewhere that Agile follows the concept of individuals and interaction over processes and tools and is asking you to clarify what that means. What would you tell the senior manager?

A). An empowered team is more important for success rather than following processes and tools.

59. You are currently working on a new and unique project requirement. The team recognizes the potential for all sorts of things to go wrong, but currently they don’t have the existing data from another group to determine how it will affect the project. Which classification would this fall under?

A). Known unknown

60. Throughout the life of the project, you have taken short spurts of time to work with the team to capture improvements in how to deliver a software package. These are usually fairly short meetings with the team. Which the following is the best description for this regular activity? A O Mid-iteration standup meeting to capture information with leader

A). End-of-iteration retrospectives with the team

61. The scope baseline should have the following three components: scope statement, cost estimates, and schedule milestones.

A). False

62. When calculating the cost performance index of the project at any point during the life of the project, which formula would you use?

A). Earned value divided by the actual cost

63. When you’re starting with a new team, it is best to help the group find a foundation through a lot of non-work-related efforts and time together. These team-building strategies would best be developed by _____________ or _____________ and making sure that they have a facilitator to expedite the unity.

A).

1. Formal

2. Informal

 


64. The team is worried about how much they will be held accountable for failures of both work product and timing. Instead of focusing on their failures, you really wish to improve the team’s focus on success and giving team members the authority to make decisions moving forward. All of the following efforts will encourage such empowerment except:

A). Always looking to provide the work on time

65. Your team is currently deciding which method of managing an upcoming project will be most appropriate. Both broadly skilled internal team members and externally contracted subject matter experts will be involved for the duration of the project. Considering that the scope is mostly defined but will likely experience some changes, the group will likely elect

A). Hybrid methods

66. The smallest segment of work that may be produced at a given time and that still provides some value is essentially the definition of which term?

A). Minimum business increment

67.The project leader for any multinational organization should be focused on communication, openness, and diversity of staff to assure meeting expectations of different styles.

A). True

68. The team on which you work has completed a recent iteration. Performance reporting will likely include all of the following except:

A). Percent complete rule

69. The concept of servant leadership was new to your team because they focused on predictive project management in the past and now are leaning more toward a hybrid environment. All of the following would be the traits of a servant leader in this environment except:

A). Demonstrating skills in each area so that the team can emulate this individual.

70. A project that was defined some time ago could do which of the following if it is running into a time crunch to meet the expected mandatory delivery date? (Choose two.)

A).

1.  Reduce the scope somewhat to keep to the scheduled timeframe.

2. Add additional resources to the project for additional cost.



71. One of the skills that a project manager must include in their toolbox is helping to identify and fill in the gaps for a team’s skillset.

A). True

72. Recently, you moved from one group into another at your organization. The prior group was fairly uniform in hiring the same types of people, but this group has individuals representing many different characteristics, skills, backgrounds, and appearances. Of the following, all of these would be beneficial results to this group’s performance from diversity except:

A). Permitting the team to come to a quick result without as much debate.

73. Which of the following options are not considered interpersonal and team skills? (Choose two.)

A).

1. Controlling teams

2. Scheduling tasks



74. When you are working with a project team to outline the ultimate risk priorities, they are frequently broken down into which areas? (Choose two.)

A).

1. Likelihood

2. Impact



75. The senior management in your organization has recently heard about Agile as a new way of managing projects and is asking for your advice on whether Agile would be the right approach for the next systems implementation. What would be the best advice you can give them?

A). We should use an Agile suitability questionnaire to assess the culture of the organization, the skill sets of employees, and the project itself to determine whether Agile would be the right approach.

76. Several people are helping to plan an 80th birthday party for a family member. Which of the following options would most likely fall under product scope? (Choose two.)

A).

1. The size, flavor, and color of the birthday cake.

2. How many chairs will be needed for the extended family



77. As the project manager for this team, you explain that the individuals who handle documents treat them diligently in modifications. When you’re relating some of the key aspects of version control, all of the following are applicable except:

A). It includes all aspects of the project, including handwritten reminders.

78. As a new project manager, you will be leading a team from the beginning for the first time. To make sure that things go well, you wish to assure that as many stakeholder requirements are met as possible. Of the following, which stakeholder category gets the highest attention from most teams?

A). User requirements

79. It is in any project team’s best interest to be aware of major risks and have a mental awareness of how certain risk events will affect the outcome. There have been many names for this tool or document. All of the following would be included except:

A). Quality plan

80. Feedback should always be formulated to provide positive comments to keep a pleasant environment.

A). False

81. Of the following, which is the least likely component of the project charter? A O Key stakeholder register

A). Outline of the primary staff expected to participate on the project

82. The types of resources most likely included in specific resource calendars would include all of the following except:

A). Email software

83. You have been waiting with your project team to get started on the next phase. However, you cannot do this until another project team starts their portion. You will basically be one step behind them until the project is completed. What is this an example of?

A). Start-to-start relationship

84. The stakeholders will be identified, categorized, and planned for engagement through a number of tools, including all except:

A). Located on the WBS

85.You have been working on the adaptive project with your team for many months. It appears that the project will be extended again because the client wishes to add even more features. You are uncertain how this will affect the budget. What is the best response?

A). Refer to the contractual agreement’s terms and conditions for added features.

86. When you are evaluating options for user preferences on requirements, which of the following is true about A/B testing?

A). It is used to optimize the solutions preferred by stakeholders.

87. A coworker who used to work with initial planning for long-term and complex interactions is now working with you on a project that exhibits rapid delivery and changing requirements. This person is curious about the differences, so you explain business value as important for all of the following reasons but one. Which one?

A). Meeting initial requests is the most important, so avoid changes where possible.

88. Which of the following are specifically artifacts that would be used in a Scrum framework for a project with a flexible scope? (Choose two.)

A).

1. Burndown chart

2. Kanban board



89. Of the following, which items would not be relevant to a contract change control system? (Choose two.)

A).

1.May permit the project contracts to be edited individually

2. May require all project changes to be approved by the supplier



90. Organizations that stay stagnant end up losing their market leadership capabilities. This situation is unfortunate but can be improved with a variety of skills, including all of the following except:

A). Encouraging the team to stay the course and keep to the established practices for uniformity

91. The team charter would support all of the following except:

A). Expressing the optimal outcome of the project work results

92. Considering that a specific project team works primarily with a collective and variety of subject matter experts, what might be the greatest issue observed in the team?

A). The possibility of a single point of failure due to resources having specific skills

93. To keep the team properly motivated, it is beneficial to provide rewards and recognition on a regular basis. Of the following, which would be considered a recognition method for someone on the team?

A). An individual receives positive comments in front of the entire department.

94. The team is working on a way to track all of the important information for how to manage similar projects in the future and realize that some of the results are based on _________, which allows for words, numbers, or images to get the message across, whereas other valuable information has to be more experiential in nature through _______.

A).

1. Tacit knowledge

2. Explicit knowledge



95.The team is waiting on a customer to provide raw materials so that the project can move forward. Without the materials, the team is stuck. This dependency would be represented by which of the following terms? (Choose two.)

A).

1. Mandatory

2. External



96. The agile team leader you have recently been assigned works differently than anyone you’ve worked with before. This leader explains that their goals are all of the following except:

A). Endlessly focusing on making sure the work is completed per the team's planned schedule.

97. There have been several discussions about making sure that every one of the product requirements is satisfied. This is the last few days of the project, and you work with the team to complete which of the following?

A). Requirement validation

98. Ineffective conflict management methods on a project team can be catastrophic. Some of the most likely results include _______, _________, and _______.

A).

1. Animosity among team members

2. Destructive behaviors

3. Reduced productivity



99. During lessons learned, the team’s staff and external suppliers may be involved. The group is looking to cover all of the following topics but which one?

A). Components of the project that were defects mostly due to typographical issues

101. Which of the following would be most appropriate for determining all stakeholder requirements?

A). Focus groups

102. As part of a project charter you were just reviewing, you noticed that it missed the mark on two key elements of success. Which words best describe what the project overview statement should include? (Choose two.)

A).

1. Clarity

2. Brevity



103. Task identification for a construction project is most likely to occur during regular checkup sessions throughout the life of the project and will be added or removed as necessary.

A). False

104. The product roadmap is a strategic document that gives direction on how a product, service, or result will be delivered to meet the product vision.

A). True

105. The team is made up of many experts in various areas of the project. Frequently, the project manager is comfortable with giving direction to individuals and making choices for the team. This is best represented by which management style?

A). Autocratic

106. When outlining the initial expectations from all stakeholders, the team wishes to assure that a responsible person and feature/function are aligned with them. What is the best tool for this purpose?

A). Requirements traceability matrix

107. Of the following elements of a lessons learned exercise in a preplanned home renovation project, in a town you will likely not work in again, which is least useful to the construction manager who acted as project manager?

A). City building code lessons learned

108. As the project manager, you have asked one of your team members to estimate a number of tasks they will perform. They seem a bit resistant because they feel this is the project manager’s job and not theirs. You explain that, when estimating activities or tasks on a project, it is best for the individual doing the work to create the performance because (Choose two.)

A).

1. Each individual should have a better concept of their own level of effort required.

2. The individual performing the work understands the risks.



109. When dealing with others on a team, you wish to encourage change. As a change catalyst, you would anticipate change, advocate for it, and question the current approaches.

A). True

110. During a negotiation with an external client, you have decided that for the sake of time, you cannot look for solutions that help with both parties and accept that both must give up something. This is an example of the compromising conflict management approach.

A). True

111. For the first time, you have been asked to select a supplier, but before doing so are interested in noting the source selection criteria. Of the following, which is least likely to be a source selection criterion?

A). Team location

112. After working on the project lessons learned in a few sessions after the project was done, the program manager suggests to the project manager that it is time to put this information into the permanent storage database. Where do they mean?

A). Lessons learned repository

113. Developing a project scope statement requires a series of tools. Of the following, which one is least likely to be a tool for this purpose?

A). Planning poker

114. All of the following methods would help with the collaboration of stakeholders except:

A). Keeping all of the communication to a planned format to avoid missing someone

115. The team has settled down to another end of iteration discussion about what went well and what did not. They are looking at the data and trying to determine which features and stories flowed well and which were a challenge. At the end of the discussion, they determine one process to change for the next iteration. This is known as a lessons learned exercise.

A). False

116. Actual cost is the measurement of work completed based on the plan value.

A). False

117. Several knowledge transfer techniques can be used to help organizations retain information and experience between staff. What are the top two?

A).

1. Work shadowing

2. Facilitating special interest groups



118. Of the following terms used in adaptive or agile projects, which one will be most useful in keeping the project on track regularly?

A).Iteration reviews

119. What are the broad categories of risk classification? (Choose two.)

A).

1. Source-based risk classification

2. Effect-based risk classification



120. Evaluating a project based on team development is difficult because people change, and the team members may change. However, team development is a necessary step for any organization that deals with longer-term projects. Of the following, which components would be most valuable to this process? (Choose two.)

A).

1. Measuring trust and respect within the team dynamic

2. Noting the level of diversity and inclusion across the team



122. A critical path activity is usually a defined activity with the highest amount of risk to the overall project budget.

A). False

123.Use of a Gantt chart is primarily to show the work packages, sequencing, relationships, and resources in a visual format for faster interpretation by participants.

A). True

 

1. All of the following methods would help with the collaboration of stakeholders except:
A).
Keeping all of the communication to a planned format to avoid missing someone.

 

2.  During a long-term project, many types of artifacts will be generated. Which of the following would be considered project artifacts? (Choose two.)

A).

1. Assumptions

2. Scope baseline



3. Based on the type of communication, who is the most likely person to initiate or share information?

 


4. One staff member on the project has outlined some concerns about meeting the quality management plan. Of the following, the project quality management plan will include all but which at a high level?
A).
Detailing the specific metrics that will be required to pass for the project

 

5. The team has been complaining to the manager about too many graphs and charts provided during meetings. The team wants more time to digest the information. In this case, the best method to communicate would likely be:

A). Email communication pushed to a database

 

6. The current organization for which you work requires that projects follow strict protocols and are approved by a specific body of senior leaders. Of the following, which elements are covered under project governance? (Choose two.)

A).

1.  Project life cycle approach

2. Project organizational structure or chart



7. Due to complications of the project missing customer satisfaction metrics, being late and over budget at the 50 percent complete points, which of the following options would be considered quality management data visualizations? (Choose two.)

A).

1. Control charts

2. Histograms



8. A planning package is typically different from a work package in that it includes work content but not detailed scheduled or cost activities.

A). True

9. Some of the greatest forms of stress that a team will face are not due to creativity and timeframe, but more likely created by values, communication methods, and competition between stakeholders, both internal and external.

A). True

 

10. Governance of a project needs to be kept as private as possible to avoid information escaping the organization.

A). False

 

11. One of the most popular methods to determine time and cost components of the quality question in projects is the earned value method.

A). True

 

12. A project artifact allows for someone to determine the history of a project and allows future project managers to learn from the development of the deliverables.

A). True

 

13. Match the method with the strategy.

A)

 


14. Recently, you moved from one group into another at your organization. The prior group was fairly uniform in hiring the same types of people, but this group has individuals representing many different characteristics, skills, backgrounds, and appearances. Of the following, all of these would be beneficial results to this group’s performance from diversity except:

A). Permitting the team to come to a quick result without as much debate.

 

15. The team is focused on delivering as close to their project budget estimate as possible. Which method would be the most appropriate for them early in the project?

A). Bottom-up estimating

 

16. As the project manager, you and your team are focused on a heavily planned project and making sure that it is completed within a reasonable timeframe. This means that execution is important. Who would be the more likely parties to be a part of this execution? (Choose two.)

A). 

1. Subject matter experts

2. Project team members

 


17. During the initial portion of a project, you noted that the team has outlined the main deliverables for a well-established scope. However, this has not been broken down into smaller subdeliverables or work packages yet. This process is frequently referred to as ___________.

A). Decomposition

 

18. In an attempt to remain customer-focused and increase your overall value to the end consumer, your team will be initiating three of the following internal programs. Which one would be excluded?

A). Ensuring compliance on all electronic communication steps within your organization and the client’s organization

 

19. The team started daily standup meetings about two weeks ago. The meetings seem to be going well, and the group has a general understanding of the process. Of the following, which are components of the standup meeting? (Choose two.)

A). 

1. Describing work that has been completed

2. Outlining work that will be done

 


20. You have been working with your team for a number of years and have found that individuals do not always work as expected in the team environment. Sometimes they behave uncharacteristically around leadership because they get nervous. Which of the following is least relevant to organizational theory?

A). Power/interest grid

 

21. When you are breaking down projects into their subtopics, predictive and agile have varying terminology. Match the terms to the predictive or adaptive/agile toolbox.

A).

 


22. The probability and impact matrix used to assess risks is primarily a tool that helps determine the detection level of a risk.

A). False

23. Decomposition is a term frequently used for breaking down work in a predictive project. It is not always done in the same format. What are the primary methods or formats used? (Choose two.)


A). 

1. Outline format

2. Organizational chart



24. The agile team leader you have recently been assigned works differently than anyone you’ve worked with before. This leader explains that their goals are all of the following except:

A). Endlessly focusing on making sure the work is completed per the team’s planned schedule

 

25. During the life of the project, an issue arose, but the team found a way to reduce the impact, implemented it, and documented it. Now, to prevent any future situation like this from arising, the team has proposed that a change request be initiated to modify how the work will be done moving forward. Which type of a change request would this fall under?

A). Preventive action

26. Of the following, which is least relevant to the business needs documents?

A). Establishes the list of stakeholders involved and classifies them.

 

27. Since 2020, your team has changed its primary methods of communication. Instead of physical location meetings, many teams have become remote. This change has required much of the team to adapt and use technology on a regular basis. Which of the following is least beneficial to collaboration technology?

A). Photocopier

 

28. You are working with senior management to determine the best approach for a high-visibility project. This will be a large project compared to others that the organization has done in the past, so the project manager will need to plan on distinct phases. However, requirements for each phase will not be fully understood and will regularly change due to changes in the business environment. Senior management, who is the customer, wants to be involved on a regular basis and would like to sign off on deliverables frequently, which could inspire the need for additional requirements. Which of the following approaches would you recommend?

A). Hybrid lifecycle

29. From iteration to iteration, a team will face challenges. The project leader will focus on helping the team members to overcome these issues as they arise. Of the following, which is not one of the specific terms used for these conditions?

A). Spike

30. Place the descriptions in the Management column or the Leadership column.

A).


31. As the leader of the project, you have been asked to assess where the team will need more assistance in coming phases of the project. Which two tools would you use for this purpose?

A). 

1.WoW

2. SWOT

 


32. Match the definition with the term for the benefits management plan.

A).

 




33. Many times, in a risk register, the team is looking to categorize risk to respond to the potential upside or downside outcomes more efficiently. Which of the following is least likely an effect-based risk classification?

A). Noting any regulations that arise due to industry advances in new technology

34. The most statistical of the consensus reaching tools would be dot voting over fist of five or polling.

A). True

35. The project manager is currently doing their best to assure that the project will be delivered satisfactorily on time and within budget expectations. Doing so will be tough, considering the complexity of the project. There will be many relationships involved. Of the following, which task relationships will be the most important for the stakeholders to clearly dictate?

A). Mandatory

36. Of the following, which is least likely to be a component to scope management planning?

A).Provides the initial product backlog with features and stories clarified in a list

 

37. Project managers frequently have to make decisions that are based on incomplete information or best guesses. This means using simulations. Which of the following is not applicable to simulations in project management?

A). Used to solve scope issues on complex situations

 

38. The product owner has just accepted the deliverable of the sprint. What will be the next step for the team?

A). Sprint retrospective

 

39. Of the following examples, which will most likely benefit from a predictive set of project management tools?

A). The design and building of bridges across major rivers

 

40. There is a recent college graduate on your team, and this team member is curious about the team charter. They share with you that they understand the team charter to be the outline of the sponsor’s vision for the best outcome from the project. Is this thinking true or false?

A). False

41. If there are several different decisions to be made and the consequences of each affect the next decision, what would be the best tool to use?

A). Decision tree

42. Projects that are known to have a high likelihood of change throughout the project, but a lower cost of change will likely use a number of additional tools, such as all of the following except:

A). Critical Path Method (CPM), which uses a predicted duration for the longest path.

43. Any plans, processes, procedures, policies, databases, or fixed tools used by the group to improve performance or use as a competitive advantage would be considered enterprise environmental factors.

A). False

44. Throughout the life of an agile project, there will be needs to update, remove, or reorganize the product life cycle. The terms for this activity include ___________ and __________

A). 

1. Refinements

2. Grooming



45. Working as a part of a government division approving a new building, you need to make sure that the budget is approved in advance. When you’re working with potential vendors, which of the following would be the most applicable contract to use in this situation?

A). Fixed price

 

46. Match the relationship to the appropriate organizational structure.

 

 

 


 

 

 

 

 

 

 

 

 

 

 

 

 

 

47.Piace the descriptions in the Management column or the Leadership column

 


48.Match the following terms to their definitions.

 


49. Match the following terms to their definitions

 


50. Match the topic to the appropriate column: environmental enterprise factors (EEFs) or organizational process assets (OPAs).

 


51. Match the definition of the response to the best example provided.

 


52. Match the social skills in the left column with the managerial skills in the right column.

 


53. Match the following terms to their definitions.



54. Match the following estimation techniques used for story points in the agile methodology to the description.

 


55. Match the following project to the method.

 


56. Match the following terms to their definitions.



57. Match the following terms to their definitions.



58. Match the type of team member with the proper category.

 


59. Match the method with the strategy.



60. Match the performance review methods in one column and the root cause analysis tools in the other.



1. A daily standup is held in the main conference room with the project leader, team, and owner on a daily basis, but is kept to one hour maximum.

A). False


62. Value delivery is about making sure that the customer or client receives benefit and the efforts of the team focus only on work that delivers value. This concept was developed early in the predictive project management life cycle.

A). False

 

 

63. At the beginning of a project, the sponsor/owner and project manager frequently get together with the team to identify stakeholders and their overall participation in the project. Of the following, which is the most problematic level of engagement?

A). Resistant

64. Senior management is looking to see whether an Agile approach would be a good option for the upcoming project and is asking you for advice. What advice would you give them?

A). Agile works best in a constantly changing business environment where small teams determine the work that will be accomplished

A


67. 
Recently, the team has noted an issue that will slow down the work progress, if not block progress completely. One team member was quick to enter the issue into the issue log, and now the team is looking to the project manager for direction on what to do next. You, as the project manager, would indicate to move forward next with

A). Assigning an individual who will be responsible from this point forward until a workaround is developed.

68. Of the following, which is least likely to be used to categorize the business environment?

A). PMO


69. Drag and drop the descriptions that belong to the given process.



Fill in the missing words

 

 1 Variable



2 Fixed


3 Direct


4. Indirect


5. Definitive Estimate


6. ROM


7. Contingency


8. Management


9. BAC


10. Cost Management

 






























Comments

Popular posts from this blog

IS5203 Type 2 Post Assessment and Final Quiz

  Carlos has just created a new subnet for the finance department. He needs to be able to allow the employees in finance to retrieve files from the sales server, which is located in another subnet. Which of the following OSI model layers would it be necessary to categorize the device into? a. Layer 4 b. Layer 6 c. Layer 2 d. Layer 3 All of the cubicles in a company's office have cables that run up to the ceiling and across to an IDF. Inside the IDF, they connect directly to the latest generation switch available from the networking equipment vendor that they have chosen. Which of the following describes the physical topology most likely in use? a. mesh

GE5163 Week8 ( Final Exam ) Quize's

  A process or product that is insensitive to normal variation is referred to as being Select one: a. in specification b. capable c. robust d. out of control Feedback Your answer is correct. A completed failure mode and effects analysis (FMEA) results in the following assessment rating.      Occurrence = 4      Severity = 8      Detection = 10 What is the risk priority number (RPN) for this FMEA? Select one: a. 42 b. 22 c. 320 d. 120 Feedback Your answer is correct. In a visual inspection situation, one of the best ways to minimize deterioration of the quality level is to: Select one: a. have a program of frequent eye exams. b. retrain the inspector frequently. c. add variety to the task. d. have a standard to compare against as an element of the operation. Feedback Your answer is correct. Which of the following elements is least necessary to a good corrective action feedback report? Select one: a. What caused the failure b. Who caused the failure c. What correction has been made d. Wh