1
Fill in the Blank
A bottleneck is a limiting factor or constraint that affects throughput in a production process.
Question 22Matching
Match the concepts with their definitions:
- 1
Design Capacity
The maximum output under ideal conditions.
- 2
Utilization
Percentage of design capacity actually achieved.
- 3
Bottleneck
Workstation that limits the overall throughput.
- 4
Effective Capacity
Expected output given current operating constraints.
Question 33True/False
Utilization measures how much of the available capacity is used.
- TTrue
- FFalse
Question 44Matching
Match the following capacity management strategies with their explanations:
- 1
Subcontracting
Adding external resources to increase capacity temporarily.
- 2
Inventory Management
Using stock to meet short-term demand fluctuations.
- 3
Downtime Reduction
Focusing on minimizing non-productive time.
- 4
Shift Adjustments
Modifying work schedules to maximize resource utilization.
Question 55True/False
Efficiency is calculated by dividing actual output by design capacity.
- TTrue
- FFalse
Question 66True/False
Bottleneck management is unnecessary in effective capacity planning.
- TTrue
- FFalse
Question 77True/False
Design capacity is always higher than effective capacity.
- TTrue
- FFalse
Question 88Jumbled Sentence
Break-even analysis finds the point at which revenue equal costs.
- Get link
- X
- Other Apps
Labels
BSAN562- Get link
- X
- Other Apps
Comments
Post a Comment